Home

Los Angeles District

Run scraper

The U.S. Army Corps of Engineers (Corps) has been prepared a supplement to the Final Supplemental Environmental Impact Statement (SEIS)/EIR for Prado Basin Vicinity

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The U.S. Army Corps of Engineers (Corps) has been prepared a supplement to the Final Supplemental Environmental Impact Statement (SEIS)/EIR for Prado Basin Vicinity, Supplemental Environmental Assessment (SEA) and Environmental Impact Report (EIR) Addendum for the Lower Norco Bluffs Toe Protection (Lower Norco Bluffs) portion of the Santa Ana River Mainstem Flood Control Project (SARMP)

This draft Supplemental Environmental Assessment (SEA) and Environmental Impact Report (EIR) Addendum for the Lower Norco Bluffs Toe Protection (Lower Norco Bluffs) portion of the Santa Ana River Mainstem Flood Control Project (SARMP) has been prepared by the U.S. Army Corps of Engineers (Corps) as a supplement to the Final Supplemental Environmental Impact Statement (SEIS)/EIR for Prado Basin Vicinity, dated November 2001 (hereinafter referred to as the 2001 SEIS/EIR). The 2001 SEIS/EIR addressed several components of SARMP within the downstream of Prado Basin, including toe protection at Lower Norco Bluffs, and assessed impacts to environmental resources related to both implementation and future maintenance.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas