PROPOSED TRANSMISSION LINE IN ST. CHARLES, ST. JOHN THE BAPTIST, AND ST. JAMES PARISHES
NAME OF APPLICANT: Entergy Waterford, c/o T. Baker Smith, LLC, Attn: Brady Trahan, 107 Global Circle, Lafayette, Louisiana 70503.
LOCATION OF WORK: Near the Mississippi River beginning at the future FG LA site in Welcome, Louisiana (30.044623, -90.932128) traveling east for approximately 32.4 miles through St. James, St. John the Baptist, and St. Charles Parishes to the Waterford Plant (30.044623, -90.932128), in Killona, Louisiana within the East Central Louisiana Coastal hydrologic unit (HUC 08090301), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested Department of the Army authorization to clear, excavate, and deposit fill to install of a 230 kv transmission line, establish a maintained right-of-way, and reroute a small drainage for the substation to supply electricity to FG LA facility and provide extra capacity for development in the surrounding area. Approximately 2,600 cubic yards of material will be excavated and hauled off site to a non-wetland location and approximately 5,200 cubic yard of aggregate material and earthen fill will be deposited for the ditch re-route and substation. Additionally, 226 pole structures will be installed in the new right-of-way to support the transmission line. Existing right-of-ways, existing roads and the new right-of-way will all be used for access