This notice announces a prospectus has been submitted for the development of the Cave Spring Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).
Public Notice No. 20-33
Nashville District
Application No. LRN-2019-01161
Date: April 29, 2020; Expires: May 29,2020
Please address commentsto:
Nashville District Corps of Engineers
Regulatory Division
3701 Bell Road
Nashville, TN 37214-2660
SUBJECT: This notice announces a prospectus has been submitted for the development of the Cave Spring Mitigation Bank pursuant to 33 CFR 332, Compensatory Mitigation for Losses of Aquatic Resources (Federal Register: April 10, 2008, effective June 9, 2008).
BANK SPONSOR: Mitigate Tennessee, LLC
PO Box 836
Hallsville, TX 75650
LOCATION: The proposed Cave Spring Mitigation Bank (CSMB) comprises approximately 24.3 acres in Roane County, Tennessee (Figure 1), located 7 miles southeast of Kingston, TN. This site is located within the Southern Limestone/Dolomite Valleys and Low Rolling Hills Level IV
Ecoregion of the Ridge and Valley.
PURPOSE: The CSMB proposes to provide compensatory stream mitigation for permitted impacts within the primary geographic service area of the Watts Bar Lake (06010201).
GENERAL INFORMATION: Mitigation banks are defined as a site, or suite of sites, where aquatic resources (e.g., wetlands, streams, riparian areas) are restored, established, enhanced, and/or preserved for the purpose of providing compensatory mitigation for impacts authorized by Department of the Army (DA) permits pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act. In general, units of restored, established, enhanced or preserved wetlands or streams are expressed as “credits” which may subsequently be withdrawn to offset “debits” incurred at a permitted project site. In this way, a permit requirement to provide compensatory mitigation can be transferred to the mitigation bank sponsor. The operation and use of a mitigation bank are governed by an approved mitigation banking instrument (MBI). The MBI is the legal document for the establishment, operation and use of a mitigation bank. This bank is intended to be a private commercial bank. The sponsor would be responsible for the successful development of the mitigation bank including monitoring and reporting requirements.
A group of federal and state regulatory and resource agency representatives known as the Interagency Review Team (IRT) would oversee the execution and management of the project. The IRT is chaired by the US Army Corps of Engineers, Nashville District (USACE). The primary role of the
IRT is to facilitate establishment of the mitigation site through the development of a MBI. The IRT will review the prospectus, instrument, and other appropriate documents and provide comments to the USACE.
Approval of the use of the bank for specific projects is the decision of the USACE pursuant to Section 10 of the Rivers and Harbors Act of 1899 and/or Section 404 of the Clean Water Act and/or the Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401 of the CWA
and/or applicable State of Tennessee statute(s) and regulation(s).
PROJECT DESCRIPTION: CSMB proposes to restore 4,974 linear feet of Cave Spring Branch and its intermittent tributaries by removing anthropogenic impairments (i.e. sediment sump), re-establishing floodplain connectivity, stabilizing streambanks, and improving stream geomorphology. The project also proposes to enhance approximately 1 mile (5,198 linear feet) of riparian buffer by removing exotic, invasive species extending buffer widths to 100 feet on each side, and improving vegetation metrics (species diversity and stems per acre). See Tables 1 and 2 for a listing of the existing and proposed stream lengths, as well as proposed functional lift fromthe proposed CSMB.
The project prospectus can be viewed by clickinghere.Information in the mitigation plan would serve as the basis for deriving and releasing credits for the mitigation bank.
Table 1. Proposed Mitigation Approaches for CSMB
Table 2. Proposed Functional Lift and Credit Calculation for CSMB
HISTORIC AND CULTURAL RESOURCES: At this early stage in the regulatory process, no project design plans have been submitted; therefore, USACE cannot complete an effects determination for historic and cultural resources. The Corps invites responses to this public notice from American Indian
Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and cultural significance at or near the project area. Upon submittal of the design plans, USACE will evaluate the design plans along with any substantive comments from this public notice to determine the potential of impacts to historic and cultural resources for Section 106 compliance.If the Corps determines that consultation is required, the Corps would consult with the Tennessee Historic Commission (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate.
ENDANGERED/THREATENED SPECIES REVIEW: A review of the United States Fish and Wildlife Service (USFWS) website, http://ecos.fws.gov/ipac identified the following federally-listed species that are known to or believed to occur in the vicinity of the proposed project (Table 3):
Table 3. Potential Endangered and Threatened Species in the Proposed Project
Group
Common Name/ Scientific Name
Federal Status
Mammal
Gray bat /Myotis grisescens
Endangered
Mammal
Indiana bat / Myotis sodalis
Endangered
Mammal
Northern Long-eared Bat / Myotis septentrionalis
Threatened
Fish
Snail Darter / Percina tanasi
Threatened
Clam
Pink Mucket (pearlymussel) / Lampsilis abrupta
Endangered
Clam
Orangefoot Pimpleback (pearlymussel) / Plethobasus cooperianus
Endangered
Snail
Anthony's Riversnail / Athearnia anthonyi
Endangered
Plants
Virginia Spiraea / Spiraea virginiana
Endangered
Plants
White Fringeless Orchid / Platanthera integrilabia
Endangered
A copy of this notice is being furnished to USFWS for their review. After receipt of any comments, the USACE will evaluate the potential effects to proposed and/or listed species and their designated critical habitat, and initiate consultation with the U.S. Fish & Wildlife Service, if required.
COMMENT PERIOD: Written statements received in this office by May 29, 2020 (30 days) will become a part of the record and will be considered in the determination. Any response to this notice should be directed to the Nashville District Corps of Engineers, Regulatory Division, Attention: Ms. Katie
Alston at the above address or by email: katherine.c.alston@usace.army.mil.
\s\
Joshua W. Frost
Chief, Technical Services Branch
Regulatory Division
U.S. Army Corps of Engineers
Nashville District