CONSTRUCT ONE BRINE PIPELINE AND ONE ETHYLENE PIPELINE IN IBERVILLE PARISH

NAME OF APPLICANT: Boardwalk Louisiana Midstream, LLC, c/o Providence Engineering and Environmental Group, LLC, Attn: Ms. Regina Staten, 1201 Main Street, Baton Rouge, Louisiana 70802.

LOCATION OF WORK: In Iberville Parish, North 30.316461, West -91.304178, located off of Louisiana Highway 1148, west of Plaquemine, Louisiana, as shown on the attached vicinity map.

CHARACTER OF WORK: Clear, grade, trench and temporarily backfill approximately 2,894 cubic yards of native material, to construct and maintain (1) 8” brine pipeline and (1) 8” ethylene pipeline to serve the #24 Brine Well, at their Bayou Choctaw Facility, near Plaquemine, Louisiana, in Iberville Parish. Approximately 3.73 acres of jurisdictional wetlands (2.70 acres PEM, 0.90 acres PFO and 0.13 acres PSS) would be temporarily impacted and approximately 0.18 of an acre (0.07 of an acre PFO and 0.11 of an acre PSS) would be impacted by permanent conversion to herbaceous right-of-ways. The applicant proposes to purchase mitigation credits from a Corps approved mitigation bank within the watershed of impact to offset all unavoidable impacts.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas