Home

Nashville District

Run scraper

A temporary work platform is being installed at Chickamauga Lock

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

A temporary work platform is being installed at Chickamauga Lock, Tennessee River Mile 471.0, in support of the on-going construction. The platform is scheduled to be in place from 7 January, 2019 to 29 March, 2019.

A temporary work platform is being installed at Chickamauga Lock, Tennessee River Mile 471.0, in support of the on-going construction. The platform is scheduled to be in place from 7 January, 2019 to 29 March, 2019.

The platform will be located immediately downstream of the cross-over bridge on the river wall and extend approximately five feet towards the lower approach above elevation 668.5. (See attached diagram).

The platform should not impede navigation but mariners are ask to exercise extreme caution during lockages. Warning signs will be posted on the upstream and downstream sides of the platform.

Marine channels VHF 14 and 16 will be monitored.

For more information, contact Cory Richardson at Chickamauga Lock at 423-875-6230.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas