Crews have completed construction on two new mooring cells at Tennessee River Mile 275.7 (Wheeler Pool)

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Crews have completed construction on two new mooring cells at Tennessee River Mile 275.7 (Wheeler Pool), near Wheeler Locks and Dam to replace federal mooring buoys at that location.  The facility is now open for use.

Crews have completed construction on two new mooring cells at Tennessee River Mile 275.7 (Wheeler Pool), near Wheeler Locks and Dam to replace federal mooring buoys at that location. The facility is now open for use.

For more information, contact: Steve Hawthorne, Southern Marine Construction at (423) 802-0597

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates