Home

Nashville District

Run scraper

Crews will be conducting maintenance dredging operations for Nucor Steel Decatur along the left descending bank at Tennessee River Mile 297

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Crews will be conducting maintenance dredging operations for Nucor Steel Decatur along the left descending bank at Tennessee River Mile 297, beginning 25 Mar and continuing through 01 Apr 2019.

Crews will be conducting maintenance dredging operations for Nucor Steel Decatur along the left descending bank at Tennessee River Mile 297, beginning 25 Mar and continuing through 01 Apr 2019. All work will be conducted outside the main navigation channel. Work Schedule: Mon-Fri from 0600 to 1800 daily. Marine Channels 72 and 65 will be monitored.

For more information, contact: Jason Cagle Kinder Morgan Bulk Terminal (205) 272-2030.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas