Home

Nashville District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Intermittent closures for major maintenance have been scheduled for Pickwick Main Lock

Intermittent closures for major maintenance have been scheduled for Pickwick Main Lock nearTennessee River Mile 206.7beginning 18 Mar 2019 and continuing through 25 July2019. Work Schedule will be seven days a week from 0600 to 1600 daily. The Auxiliary chamber (600’x110’) will be available for lockage. In the event that the Auxiliary is not available, lockage will be completed through the main chamber after work hours from 1630 to 0600 the following morning.

For more information contact: Brian Brewer, Brian.D.Brewer@usace.army.mil or (731) 925-2334.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas