You can copy from here when filling out the rest of the page.
There will be a scheduled temporary closure of the Kentucky Lock near Tennessee River Mile 22.4 in
There will be a scheduled temporary closureof theKentucky Locknear Tennessee River Mile 22.4in support of on-going construction of the new lock addition project, beginning at 0600 on 22 Feb 2019 and continuing through 1800 on 23 Feb 2019. The contractor will be swapping the power feeds from the old conduit path to the new path.
For more information contact: John "Caleb" Skinner, Kentucky Lock Masters Office at (270) 362-4226.