In preparation for Friday's (22 Feb 2019) 36-hour closure at Kentucky Lock

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

In preparation for Friday's (22 Feb 2019) 36-hour closure at Kentucky Lock, the existing wiring was

In preparation for Friday's (22 Feb 2019) 36-hour closure at Kentucky Lock, the existing wiring was inspected this morning. This inspection revealed previously unknown damage to the wiring at the lock from the 7 Feb 2019 lightning strike at the project. In order to be ready for the required 24 hours closure, the contractor will have to test the insulation on the wires to determine the extent of the damage and ensure the existing wire meets safety standards. This testing will require two 12-hour closures: 0600-1800 on both 20 and 21 Feb 2019. The scheduled 36-hour closure, 0600, 22 Feb to 1800, 23 Feb 2019, will still take place as scheduled.

For more information contact: John "Caleb" Skinner, Kentucky Lock Masters Office at (270) 362-4226.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas