You can copy from here when filling out the rest of the page.
Cheatham LockĀ (at Cumberland River Mile 148.7) will be back to normal locking operations at 0600 on
Cheatham Lock(at Cumberland River Mile 148.7) will be back to normal locking operations at 0600 on 26 Mar 2019. Repairs and full power have been restored to the lock and navigation will be able to resume normal operating hours (24/7) and procedures.
For more information contact: John Tribble at john.d.tribble@usace.army.mil or (615) 736-7809.