Home

Nashville District

Run scraper

Mariners can expect intermittent delays at Chickamauga Lock

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Mariners can expect intermittent delays at Chickamauga Lock, Tennessee River mile 471.0 during the

Mariners can expect intermittent delays at Chickamauga Lock, Tennessee River mile 471.0 during the daylight hours of May 23rd, 24th, 28th and 29th while contractors install a new conveyor belt system over the lower lock approach. During construction, vessels will not be allowed to pass under the conveyor system. There is no auxiliary lock chamber at this location. Vessel operators are advised to plan any lockages around the work period accordingly.

For more information contact: Cory Richardson, Chickamauga Lock at (423) 875-6230

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas