Home

Nashville District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Marine Solutions will be conducting underwater inspections at the dock facilities for Marathon

Marine Solutions will be conducting underwater inspections at the dock facilities for Marathon Petroleum at the following sites and dates:

Site #1 Cumberland River Mile 185.5 29-31 Jul 2019

Site #2 Cumberland River Mile 187.3 08-12 Jul 2019

Site #3 Cumberland River Mile 190.2 08-12 Jul 2019

Work Schedule:

Mon- Fri: 7:00 am – 6:00 pm daily

Mariners can expect to see a 30-foot dive inspection boat along the right descending bank. The dive boat will be removed from the water during non-working hours. Marine channel 16 will be monitored. Mariners are asked to exercise caution when transiting these areas.

For more information contact: Stephen Owen, Marine Solutions at(812) 320-9425.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas