You can copy from here when filling out the rest of the page.
***SCHEDULE CHANGE*** (REFERENCE NOTICE TO NAVIGATION INTERESTS LRN 19-26) Moran Environmental
***SCHEDULE CHANGE***
(REFERENCE NOTICE TO NAVIGATION INTERESTS LRN 19-26)
Moran Environmental Recovery, LLC will be performing diving operations near Cumberland River mile 120.25 supporting the installation of a raw water intake.
Work Schedule:
17 Jun 2019 – 16 Aug 2019 from 7:00 am – 8:00 pm daily.
Mariners should expect to see two work boats and a 2400 square foot barge (dive platform) on the right descending bank, and at times, the diver may be in the navigation channel. “Diver Down” flagging will be prominently displayed. The barge will be moored near the bank during non-working hours with proper illumination. Marine channels 13 and 16 will be monitored during operations.
For more information contact: Shelby Kingston, Moran Environmental Recovery LLC, (270) 753-9654.