Navigation Notice 19-31: Federal Mooring Cell Construction

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Construction for the replacement of the two federal mooring cells at Tennessee River Mile 303 is

Construction for the replacement of the two federal mooring cells at Tennessee River Mile 303 is scheduled to begin Mon, 5 Aug 2019 and continue through 31 Jan 2020.

Work Schedule: Mon – Fri Daylight hours.

Mariners can expect to see the MV Low Bid Too, a crane barge and flat deck barge at the construction site. Construction equipment will be moored at the work site during non-working hours. Mariners are encouraged to exercise caution when transiting this area. Mooring at this location is prohibited during this construction. Tows should use the mooring cells at mile 306.3. Marine radio channel 13 will be monitored during operations.

For more information contact: Steve Hawthorne, Southern Marine Construction, Inc., (423) 802-0597.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas