You can copy from here when filling out the rest of the page.
Crews will be conducting metal recovery operations at the Nucor Steel Decatur terminal facility
Crews will be conducting metal recovery operations at the Nucor Steel Decatur terminal facility beginning 5 Aug 2019 and continuing through 10 Aug, 2019. All work will be performed outside the navigation channel in the vicinity of Tennessee River Mile 297, left descending bank.
Work Schedule: 6:00 am – 6:00 pm daily. Mariners are encouraged to exercise caution when transiting this area. Marine radio channels 72 and 65 will be monitored during operations.
For more information contact: Jason Cagle, Kinder Morgan Bulk Material at (250) 272-2030.