*****CHANGE IN SCHEDULE*****REFERENCE NOTICE TO NAVIGATION INTERESTS LRN 19-25Channel maintenance
*****CHANGE IN SCHEDULE*****
REFERENCE NOTICE TO NAVIGATION INTERESTS LRN 19-25
Channel maintenance dredging will begin at Cumberland River Mile 104 (Cumberland City Island) beginning 5 Aug 2019 and continuing through 30 Aug 2019. The daily work schedule will be0600-2400 hours, seven days a week. Marine Channel 13 and 16 will be monitored during working hours. Mariners should expect to see 2-3 tow boats and deck barges with cranes, 1-2 small crew vessels and several material barges moving within the work area. Equipment will be moored outside the navigation channel near the work site during non-working hours.
For more information contact: Owen Traughber, U.S. Army Corps of Engineers, (615) 736-5608.