You can copy from here when filling out the rest of the page.
In order to ensure the operability of the BAFF (BioAcoustic Fish Fence) System at Barkley Lock (See
In order to ensure the operability of the BAFF (BioAcoustic Fish Fence) System at Barkley Lock (See LRN 19-49), a series of intermittent lock closures will occur between 12 Nov and 17 Dec, 2019 to provide for diver and ROV inspections of the system. Closures will occur on the following dates:
On Nov 12th, 19th, and 26th, a series of 4-hour lock closures for ROV inspection.
Dec 2nd - 6th, 12-hour lock closures from 6 A.M. – 6 P.M. for diver inspection. Limited maintenance may be necessary during this time around the BAFF.
Dec 10th and 17th, a series of 4-hour lock closures for additional ROV inspections.
For further information contact: John "Caleb" Skinner at John.C.Skinner@usace.army.mil or (270) 362-4226.