INSTALL AND MAINTAIN 4-12” PIPELINE IN ST. CHARLES PARISH

NAME OF APPLICANT: International-Matex Tank Terminals, c/o Ramboll, Attention: Adam Goodine, 1055 St. Charles Avenue, Suite 501, New Orleans, Louisiana 70130.

LOCATION OF WORK: Project site is located from St. Rose to Norco, in St. Charles Parish, Louisiana, as shown on the attached drawings.

POB: Latitude: 29.95295 Longitude: -90.333986

POE: Latitude: 30.017614 Longitude: -90.404987

Hydrologic Unit Codes: 08090203, Eastern Louisiana Coastal

CHARACTER OF WORK: Clear, grade, excavate and fill for 4-12” diameter pipelines for the transport of petrochemical and green diesel products. Pipelines will be installed via trenching and horizontal directional drilling methods. The project as proposed would directly impact 36.6 acres (permanently) and 19.3 acres (temporarily) of jurisdictional wetlands. The applicant proposed to contract with an approved mitigation bank in order to offset the adverse permanent impact to jurisdictional wetlands and wishes to return jurisdictional wetlands temporarily impacted to pre- existing contours with plantings

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas