This is an After-The-Fact (ATF) application for the placement of fill material into an unnamed tributaries of Broken Arrow Creek for a residential development. The applicant has constructed residential homes, road infrastructure, a reinforced concrete box, and expanded a pond in waters of the United States without a Department of the Amy Permit.
The proposed project is in the Northwest 1/4 of Section 28, Township 18 North, Range 15 East, in Wagoner County, Oklahoma. The project site can be found on the Mingo Oklahoma 7.5 Minute USGS Quadrangle map at North Latitude 36.013605 and West Longitude 95.721495.
The overall purpose of this work is for a residential development, to include associated utilities and roadways. The applicant also constructed a pond outlet and two off-channel stormwater management basins that discharges into the unnamed tributary to manage the 100-year flood frequency event.
The project is not a water dependent activity and there are no special aquatic sites are located within the project site.
The ATF permit proposal would require the placement of 137 CY of earthen material into approximately 1,075 LF (0.30 AC) of stream channel. Also, the applicant proposes to construct a new channel to reroute waters of the United States for approximately 507 LF (0.12 AC) using 54 CY of earthen material for seven completed homes and two access roads.
The applicant expanded an existing pond (0.40 AC) that is now 2.15 AC and a new spillway using concrete and two stormwater managements in the uplands that was constructed in the uplands that discharges into the unnamed tributary of Broken Arrow.
Finally, the applicant constructed a 10- by 12-foot reinforced concrete box and wing walls for approximately 145 LF (0.09 AC) using Type 1 Class A concrete. The fill material may consist of concrete, gravel, sand, and earthen material. The work would be performed using conventional earth moving equipment.