Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Application for Permit South Mission Beach Storm Drain Improvements and Green Infrastructure Project

The proposed project would implement storm drain improvements to storm drain systems to reduce flood risk and inundation within the project vicinity, improve water quality within Mariner’s Basin and the Entrance Channel of Mission Bay, and reduce beach erosion and utility conflicts with beach use and maintenance.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas