Proposed Barge Fleeting at Cumberland River Miles 183.5 and 184.5, Right Bank, Nashville, Davidson County, Tennessee (Pine Bluff Nashville)
Public Notice No. 20-34
Nashville District
Application No. LRN-2018-00665
Date: May 22, 2020; Expires: June 21, 2020
Please address all comments to:
Nashville District U.S. Army Corps of Engineers (USACE),
Regulatory Branch (Attn: Amy Robinson),
3701 Bell Road,
Nashville, TN 37214,
email: amy.m.robinson@usace.army.mil.
SUBJECT: Proposed Barge Fleeting at Cumberland River Miles 183.5 and 184.5, Right Bank, Nashville, Davidson County, Tennessee (Pine Bluff Nashville)
TO ALL CONCERNED: This project has been submitted for a Department of the Army (DA) permit pursuant to Section 10 of the Rivers and Harbors Act of 1899 and for approval of a Consent to Easement onGovernment flowage easement.
APPLICANT:Pine Bluff Materials Company
1030 Visco Drive
Nashville, Tennessee 37210
LOCATION: Cumberland River Miles 183.5 and 184.5, Right Bank, Flowage Easement Tract 1112-1-E, Cheatham Lake, in Nashville, Davidson County, TN. USGS Quad Nashville West. Latitude 36.169578, Longitude -86.841783. Cumberland River Navigation Chart 25.
DESCRIPTION: The applicant is requesting to establish two barge fleeting areas for a total of 40 barges along approximately 4,000 linear feet of river at the subject locations. Each fleeting area would consist of two groups of 10 barges configured 2 wide (70 feet) by 5 long (1000 feet). The fleet breast line would extend approximately 150 feet riverward from the river bank.
The applicant proposes to moor each fleeted group of ten barges with a spud barge (4 spud barges total) equipped with an anchor on the river bottom. Each spud barge would be secured with two spuds constructed 36-inch diameter and 60-foot in height. Two cubic yards of concrete would be poured into the lower portion of each spud and extend through the spud barge hull to the river bottom. The applicant calculates the spuds weigh approximately 18,600 pounds each plus an additional 7,992 pounds of concrete per spud, totaling 26,592 pounds per spud; therefore, the two spuds per barge apply approximately 53,184 pounds of stability per spud barge/fleeted group of 10 barges. In addition, an anchor would be installed for each spud barge consisting of a Danforth type weighing 10,000 pounds and proof test rating of 165,600. The anchor chain is projected to be 1¾- inch stud link chain (grade 2) with a proof test rating of 176,600. A bridle of chain would lay from barge bow timberhead to timberhead from which a 200-foot course of chain would continue down to connect the anchor.
The applicant performed a test to prove stability of the proposed anchorage system by installing one temporary, test spud barge to moor a maximum of ten barges located at Cumberland River Mile 183.5. A Letter of Permission was issued on June 3, 2019 for the temporary, test spud barge with special conditions carried out during installation, monitoring, daily data recording, and reporting. During the test period from June 4, 2019 through March 31, 2020, no movement of the spud barge was recorded. The test period experienced six high water events known as the “Watch Phase” when water reaches Elevation 393.2 (or 25’ reading on the Nashville Riverfront Gauge), four “Action Phases” when water reaches Elevation 398.2’ (or 30’ reading on the Riverfront Gauge), and one “Emergency Phase” when the water level exceed Elevation 403.2’ (or 35’ reading on the Nashville Riverfront Gauge). The USACE determined the spud barge met the stability test requirements and accepted an application for the two proposed permanent fleeting sites utilizing spud barges as anchorage.
According to the applicant, the location has sufficient water depth (minimum 10' draft depth) and dredging would not be required. No other work within the waterway would be required. Three existing barge terminals in the Nashville area will provide off-loading service of the aggregate material which are Pine Bluff Materials located at CRM 175.6, Pine Bluff Materials located at CRM 192.8, and Hailey’s Harbor River Transportation Terminal at CRM 180.1.
Plans of the proposed work are attached to this notice. If you wish to view additional plans, please contact this office or visit our web site at:
http://www.lrn.usace.army.mil/Media/PublicNotices.aspx.
PURPOSE AND NEED: To establish permanent anchorage for two barge fleeting areas waiting to unload aggregate for concrete and asphalt paving production in the Nashville area. The proposed project is water dependent.
AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: The applicant stated the aggregate materials could be delivered exclusively via truck transport; however, this type of delivery has proven to be costly and inefficient. They stated adequate fleeting locations in the area allow timely deliveries of material. The applicant estimates that one barge load of aggregate equates to approximately 60 tractor-trailer loads of material. In turn,
a 10-barge tow equates to approximately 600 tractor-trailer loads which would reduce tremendous amount of heavy truck traffic. The applicant stated the proposed fleeting locations were strategically selected in proximity along the shoreline avoiding an existing landfill operated by Metro Nashville, other existing marine terminal facilities and/or fleeting areas, and positioned on the inside of a river bend to minimize navigation issues.
PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of
important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.
SOLICITATION OF COMMENTS: USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangere species, historical properties, water quality, general environmental effects, and the other public interest factors listed above.Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. If necessary, an EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested DA Permit.
HISTORIC AND CULTURAL RESOURCES: The proposed work involves very minimal ground disturbance by dropping four spuds, 36-inch diameter, into the river bottom for spud barge anchorage. The spuds are expected to penetrate no more than 5’ deep below the river bottom (Elevation 368.1) into the top sediment layer. There are no known National Register eligible or listed properties within the permit area or immediate vicinity and has no potential to affect historic properties. The Corps has determined that it has fulfilled its responsibilities under Section 106. This notice serves to
initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and areas of cultural significance at or near the project area. Any substantive comments would be considered to determine the potential of impacts of the project to historic properties and would initiate any required consultation with the SHPO and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act.
ENDANGERED/THREATENED SPECIES REVIEW: A review of USFWS’s Information for Planning and Conservation (IpaC) website (http://ecos.fws.gov/ipac/) identified the following federally-listed Threatened (T) and/or Endangered (E) species that may occur or could potentially be affected by the
activities in this location:
Group
Name
Status
Determination
Clams
Cumberlandian Combshell Epioblasma brevidens)
E
May affect; not likely to adversely affect
Clams
Orangefoot pimpleback Plethobasus cooperianus)
E
May affect; not likely to adversely affect
Clams
Pink Mucket (Lampsilis abrupta)
E
May affect; not likely to adversely affect
Clams
Ring Pink (Obovaria retusa)
E
May affect; not likely to adversely affect
Mammal
Indiana bat (Myotis sodalis)
E
No effect
Mammal
Gray bat (Myotis grisescens)
E
No effect
Mammal
Northern Long-Eared Bat
(Myotis septentrionalis)
T
No effect
No designated critical habitat areas were identified.
The project is contained to the waterway and no upland areas or tree removal would be required.Spuds are expected to penetrate into the top layer of river bottom sediments that are approximately 20 to 30 feet deep. No significant adverse effects to fish and wildlife, their habitats and human uses are expected to result from the proposed work.
The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed under the ESA as threatened or endangered or any designated critical habitat. A copy of the notice is being furnished to the USFWS for their review. This public notice serves as coordination with the USFWS pursuant to Section 7 of the ESA of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to threatened and/or endangered species. After receipt of comments, the U.S. Army Corps of Engineers (USACE) will evaluate the potential effects on proposed and/or listed species and their
designated critical habitat and initiate consultation with USFWS, if required.
OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work include, but not limited to:
a. A Section 408 approval from the Nashville District is required to ensure the work is not injurious to the public interest or impair the usefulness of the USACE Navigation project.
b. Consent to Easement from USACE Real Estate Office.
PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specifiedin this notice, that a public hearing be held to consider this application. Requests for hearings shall state, with particularity, the reasons for holding a hearing.
COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and considered in the determination. Any response to this notice should be directed to the Regulatory Division, Attention: Amy Robinson at email:
amy.m.robinson@usace.army.mil.
If you received this notice by mail and wish to view all of the diagrams, visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx, or contact Ms. Robinson at the above email.
/s/
Timothy C. Wilder
Chief, West Branch
Regulatory Division
U.S. Army Corps of Engineers