The applicant has requested to discharge dredged and/or fill material into 3,869 linear feet (0.42 acre) of 23 ephemeral streams, in conjunction with the construction, operation and reclamation of the Maben-Sewell Highwall Mine No. 1.
TO WHOM IT MAY CONCERN: The following application has been submitted for a Department of the Army (DA) Permit under the provisions of Section 404 of the Clean Water Act for the proposed discharge dredged and/or fill material into waters of the United States (U.S.). This notice serves as the U.S. Army Corps of Engineers’ (Corps) request to the West Virginia Department of Environmental Protection (WVDEP) to act on the Section 401 Water Quality Certification (WQC) for the following application.
APPLICANT: Maben Coal LLC
13905 MacCorkle Avenue, Suite 501
One Carbon Center
Charleston, West Virginia 25315
LOCATION: As shown on Sheet # of 23, the proposed project would be located near the community of Maben, in the Slab Fork District of Wyoming and Raleigh Counties, West Virginia at latitude 37.659444° North and longitude -81.363888° West. The proposed surface mine would be constructed in unnamed tributaries of Cedar Creek and unnamed tributaries of Left Fork. Cedar Creek and Left Fork flow into Slab Fork, a tributary of the Tug Fork River, a traditional navigable water of the U.S. See Sheet 1 of 23 for a depiction of the proposed project location.
DESCRIPTION OF THE PROPOSED WORK: The applicant has requested a DA permit to discharge dredged and/or fill material into 3,869 linear feet (0.42 acre) of 23 ephemeral streams, as indicated on Sheets 2-11 of 23 and Table 1, in conjunction with the construction, operation and reclamation of the Maben-Sewell Highwall Mine No. 1. The sediment control features and overburden disposal areas would all occur in upland areas. The purpose of the project is to remove approximately 913,139 tons of bituminous metallurgical coal reserves within the 197.2-acre Surface Mining Control and Reclamation Act (SMCRA) permit area. The mining plan, exclusive of reclamation, would occur over a period of two (2) years. The post-mine land use is forestland. The applicant has applied to the WVDEP for the required SMCRA permit (S-5008-19). Plans of the proposal are attached to this notice (Sheets 2-23). A copy of the application, including all supplemental materials (alternative analysis, compensatory mitigation plan, environmental information documents, etc.), is available for review via a Freedom of Information Act request.
ALTERNATIVE ANALYSIS: Approximately 3,869 linear feet (0.42 acre) of ephemeral streams are proposed to be permanently impacted as a result of the mining activities. No wetlands or other special aquatic sites would be affected by the discharge of dredged and/or fill material. No permit will be issued unless the alternatives analysis clearly demonstrates that practicable upland alternatives are not available to achieve the overall project purpose. The applicant has submitted the required alternative analysis for review.
AVOIDANCE AND MINIMIZATION: In evaluating a project area containing waters of the U.S., consideration must be given to avoiding impacts on these sites. If waters of the U.S. cannot be avoided, then impacts must be minimized. The overall site contains approximately 24,729 linear feet of intermittent and ephemeral streams, 1.55 acres of wetlands, and 0.59 acre of open waters. The applicant has indicated they have considered various mine plans to accomplish their proposal. While the proposal cannot eliminate discharges of dredged and/or fill material into waters of the U.S., the proposal has been designed to eliminate discharges of dredged and/or fill material into the higher quality aquatic resources at the site. The applicant stated the mine plan and developmental sequence were designed to avoid and minimize the discharge of dredged and/or fill material into waters of the U.S. to the maximum extent practicable, while meeting the stated project purpose. As a result of their avoidance and minimization efforts, the applicant’s proposed mine plan would result into discharges of dredged and/or fill material into 3,869 linear feet of ephemeral stream channels and would avoid approximately 84% of the streams (including all intermittent stream channels) and 100% of the wetlands located at the site. The material proposed to be discharged into waters of the U.S. consists of native, durable rock and clean earthen soil. Best management practices, including the use of temporary sediment control structures and contemporaneous reclamation and re-vegetation of disturbed areas, would be utilized. The applicant’s material handling plan would assure that all dredged and/or fill material discharged into waters of the U.S. would be managed and monitored pursuant to the required Section 402 National Pollutant Discharge Elimination System permit (issued by the WVDEP) to ensure water quality standards are met. After mining and reclamation, the applicant would establish 6,377 linear feet of ephemeral stream channel on-site and the area would be returned to a post-mining land use of forestland.
COMPENSATORY MITIGATION PLAN: The applicant has submitted a compensatory mitigation plan to compensate for unavoidable discharges of dredged and/or fill material into waters of the U.S. The applicant proposes to establish 6,377 linear feet of 23 ephemeral stream channels within the same hollows of the streams proposed for impact at the site. To calculate an appropriate amount of mitigation to compensate for the loss of waters of the U.S. associated with the proposed project, the applicant used the Corps’ West Virginia Stream and Wetland Valuation Metric (SWVM, Version 2.1). The SWVM compares baseline data with anticipated or actual post-mitigation data to calculate impact debits and mitigation credits. The impact debits for the proposed surface mine total 2,177.24. The applicant’s compensatory mitigation plan is proposed to produce 2,513.06 mitigation credits in association with the on-site stream establishment activities. The established stream channels would be constructed to have the same stream morphology, drainage, and physical habitat as the affected stream channels. The established stream channels would have a 24-inch channel bottom, 2:1 stream banks, and would have stream slopes ranging between 1-3 percent. A 100-foot riparian buffer, measuring 50-feet from the top of each bank, would be established along each established stream channel. Long-term site protection would be provided for each established stream channel. The applicant’s compensatory mitigation plan includes a 10-year monitoring and adaptive management plan to assess the success of the mitigation sites using geomorphic, biological, and habitat assessment tools. The applicant’s compensatory mitigation plan is currently under review and is available for review via the Freedom of Information Act request. The proposed compensatory mitigation plan is open to comment and is subject to change based on comments received. After review of all the submitted information the Corps will make a determination of appropriate mitigation, in the event a decision is made to issue a permit.
WATER QUALITY CERTIFICATION: An individual Section 401 WQC is required for this project. The applicant’s WQC application is currently under evaluation by the WVDEP.
HISTORIC AND CULTURAL RESOURCES: The National Register of Historic Places (NRHP) has been consulted and it has been determined there are no properties currently listed on the NRHP that would be indirectly or directly affected by the proposed work. In a letter dated November 19, 2018, the West Virginia Division of Culture (WVDCH) stated the proposal would not affect any archaeological properties listed on or eligible for the NRHP. They also indicated that one (1) architectural property, Site WM-0149 (railroad overpass), which has been inventoried as a part of the multi-county Coal Heritage survey, is located within the viewshed of the proposal. Site WM-0149 has been determined to be eligible for the NRHP. The WVDCH further indicated that because Site WM-0149 is located within the viewshed of the original pre-SMCRA highwall mining that has occurred at the site, the new highwall mining proposal would have no adverse effect on Site WM-0149. The WVDCH stated no further coordination is required with their office unless the scope and nature of the proposal changes. This Public Notice serves as coordination with the WVDCH, pursuant to Section 106 of the National Historic Preservation Act of 1966. No DA permit will be issued until all obligations under Section 106 of the National Historic Preservation Act of 1966 have been fulfiled.
ENDANGERED/THREATENED SPECIES: The proposal lies within the range of the endangered gray bat (Myotis gresescens), the endangered Indiana bat (Myotis soldalis), the threatened northern long-eared bat (Myotis septentrionalis), the endangered Virginia big-eared bat (Corynorhinus townsendii virginianus), and the endangered Guyandotte River crayfish (Cambarus veteranus). In a letter dated March 3, 2020, the WVDEP stated the proposal is not likely to affect any federally listed endangered and/or threatened species or their critical habitat. This Public Notice serves as coordination with the United States Fish and Wildlife Service and the WVDEP concerning any information they may have on whether any listed or proposed to be listed endangered or threatened species may be present in the area which would be affected by the activity, pursuant to Section 7(c) of the Endangered Species Act of 1972 (as amended). No DA permit will be issued until the Corps has verified that all obligations under Section 7 of the Endangered Species Act have been fulfilled.
PUBLIC INTEREST REVIEW AND CUMULATIVE EFFECTS: This application will be reviewed in accordance with 33 CFR 320‑332, the Regulatory Program of the Corps, and other pertinent laws, regulations, and executive orders. Our evaluation will also follow guidelines published by the U.S. Environmental Protection Agency pursuant to Section 404(b)(1) of the Clean Water Act (40 CFR 230). The decision whether to issue a permit will be based on an evaluation of the probable impacts, including cumulative impacts, of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits that reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors that may be relevant to the proposal will be considered including the cumulative effects thereof; of those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and we are of the people.
SOLICITATION OF COMMENTS: The Corps is soliciting comments from the public, Federal, state, and local agencies and officials, Indian Tribes, and other interested parties in order to consider and evaluate the impacts of this proposed activity. For accuracy and completeness of the administrative record, all data in support of or in opposition to the proposed work should be submitted in writing setting forth sufficient detail to furnish a clear understanding of the reasons for support or opposition. Any person may request, in writing, within the comment period specified in the notice, that a public hearing be held to consider the application. Requests for public hearings shall state, with particularity, the reasons for holding a public hearing. Any comments received will be considered by the Corps to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Written statements on these factors received in this office on or before the expiration date of this Public Notice will become a part of the record and will be considered in the final determination. A permit will be granted unless its issuance is found to be contrary to the public interest.
CLOSE OF COMMENT PERIOD: Comments and requests for additional information should be submitted electronically to Kimberly Courts-Brown by email at Kimberly.d.courtsbrown@usace.army.mil. If you do not have internet access, comments may be submitted through the U.S. Postal Service (USPS) to the following address:
U.S. Army Corps of Engineers, Huntington District
ATTN: CELRH-RD-E Public Notice: LRH-2018-572-TUG
502 Eighth Street
Huntington, West Virginia 25701-2070
Comments should only be provided through the USPS when electronic transmission is not possible. Precautionary internal mail handling procedures may be instituted to protect our workforce, which may result in longer than normal times to process and receive hard copy submissions. To be considered in our evaluation, comments submitted through the USPS should have a postmark dated on, or prior to, the close of the comment period listed on page one (1) of this Public Notice.
Please note that names and addresses of those who submit comments in response to this Public Notice become part of our administrative record, and, as such, may be available to the public under provisions of the Freedom of Information Act. Thank you for your interest in our nation's water resources. If you have any questions concerning this Public Notice, please contact Kimberly Courts-Brown of the Energy Resource Branch at (304) 399-6906 or by email at Kimberly.d.courtsbrown@usace.army.mil.
Table-1Proposed Discharges of Dredged and/or Fill Material
Maben-Sewell Highwall Mine No. 1 (S-5008-19)
LRH-2019-572-TUG
Permanent Discharges of Dredged and/or Fill Material
Mining Activity
Name of Stream
Flow Regime
Length/Acreage
(linear feet and acreage)
Mine-Through
Stream 28
UNT Left Fork
Ephemeral
100 linear feet/
0.005 acre
Mine-Through
Stream 29
UNT Left Fork
Ephemeral
160 linear feet/
0.007 acre
Mine-Through
Stream 30
UNT Cedar Creek
Ephemeral
100 linear feet/
0.02 acre
Mine-Through
Stream 32
UNT Cedar Creek
Ephemeral
40 linear feet/
0.005 acre
Mine-Through
Stream 33
UNT Cedar Creek
Ephemeral
62 linear feet/
0.003 acre
Mine-Through
Stream 34
UNT Cedar Creek
Ephemeral
90 linear feet/
0.008 acre
Mine-Through
Stream 35
UNT Cedar Creek
Ephemeral
70 linear feet/
0.005 acre
Mine-Through
Stream 36
UNT Cedar Creek
Ephemeral
300 linear feet/
0.06 acre
Mine-Through
Stream 37
UNT Cedar Creek
Ephemeral
35 linear feet/
0.006 acre
Mine-Through
Stream 38
UNT Cedar Creek
Ephemeral
35 feet/
0.02 linear feet
Mine-Through
Stream 39
UNT Cedar Creek
Ephemeral
44 linear feet
0.02 acre
Mine-Through
Stream 40
UNT Cedar Creek
Ephemeral
367 linear feet/
0.08 acre
Mine-Through
Stream 41
UNT Cedar Creek
Ephemeral
61 linear feet/
0.01 acre
Mine-Through
Stream 79
UNT Cedar Creek
Ephemeral
60 linear feet/
0.006 acre
Mine-Through
Stream 80
UNT Cedar Creek
Ephemeral
50 linear feet/
0.005 acre
Mine-Through
Stream 81
UNT Cedar Creek
Ephemeral
165 linear feet/
0.02 acre
Mine-Through
Stream 82
UNT Cedar Creek
Ephemeral
23 linear feet/
0.002 acre
Mine-Through
Stream 85
UNT Cedar Creek
Ephemeral
27 linear feet/
0.002 acre
Mine-Through
Stream 86
UNT Cedar Creek
Ephemeral
260 linear feet/
0.02 acre
Mine-Through
Stream 87
UNT Cedar Creek
Ephemeral
100 linear feet/
0.01 acre
Mine-Through
Stream 88
UNT Cedar Creek
Ephemeral
400 linear feet/
0.12 acre
Mine-Through
Stream 89
UNT Cedar Creek
Ephemeral
320 linear feet/
0.08 acre
Mine-Through
Stream 90
UNT Cedar Creek
Ephemeral
1,000 linear feet/
0.40 acre
TOTAL PERMANENT DISCHARGES
3,869 linear feet/
0.91 acre
Table 2 – Proposed On-Site Mitigation (Stream Establishment)
Maben-Sewell Highwall Mine No. 1 (S-5008-19)
LRH-2019-572-TUG
Stream Name
Impact Length (linear feet)
Establishment Length
Flow
Regime
SWVM Debits
SWVM Credits
Existing
&
Target RBP
At 10 years
Existing
&
Target Average HGM
FCI At 10 Years
Stream 28
100
200
Ephemeral
51.4625
66.8250
58
0.25
Stream 29
160
224
Ephemeral
102.4267
107.8560
72
0.41
Stream 30
100
339
Ephemeral
64.0167
163.2285
72
0.41
Stream 32
40
40
Ephemeral
20.4317
13.1850
58
0.25
Stream 33
62
62
Ephemeral
31.6691
20.4366
58
0.25
Stream 34
90
171
Ephemeral
45.9731
56.3659
58
0.25
Stream 35
70
141
Ephemeral
35.7554
46.4771
58
0.25
Stream 36
300
300
Ephemeral
173.9375
123.1875
58
0.28
Stream 37
35
35
Ephemeral
17.8777
11.5369
58
0.25
Stream 38
35
35
Ephemeral
17.8777
11.5369
58
0.25
Stream 39
44
44
Ephemeral
22.4748
14.5035
58
0.25
Stream 40
367
368
Ephemeral
205.0460
142.0020
70
0.28
Stream 41
61
61
Ephemeral
33.3797
22.7147
70
0.26
Stream 79
60
60
Ephemeral
33.1200
22.6800
68
0.28
Stream 80
50
685
Ephemeral
28.5583
274.3425
68
0.31
Stream 81
165
288
Ephemeral
94.2425
115.3440
68
0.31
Stream 82
23
23
Ephemeral
11.7482
7.5814
58
0.25
Stream 85
27
27
Ephemeral
13.7914
8.8999
58
0.25
Stream 86
260
402
Ephemeral
145.2642
155.1218
70
0.28
Stream 87
100
329
Ephemeral
56.4938
129.3587
71
0.29
Stream 88
400
554
Ephemeral
225.9750
217.8259
71
0.29
Stream 89
320
541
Ephemeral
180.7800
212.7144
71
0.29
Stream 90
1,000
1,448
Ephemeral
564.9375
569.3355
71
0.29
TOTALS
Stream Impacts
3,869 linear feet
Stream Establishment
6,377 linear feet
SWVM Debits
2,177.2377
SWVM Credits
2,513.0599
Net SWVM Credits
+335.8222