Effective Aug. 1, new tolls will be established for placement of dredged material at Craney Island Dredged Material Management Area.

June 1, 2020 CENAO-WRO-O

Effective Aug. 1,the tolls for placement of dredged material at Craney Island Dredged Material Management Area (CIDMMA) are established as follows:

SCHEDULE OF CRANEY ISLAND TOLL CHARGES Deposit in Rehandling Basin by scow: $7.27 per cubic yard Direct deposit in placement area: $1.84 per cubic yard

The law that established CIDMMA requires all expenditures be amortized over the project life as adopted into law byCongress onMay 6, 1946. It directed the Corps of Engineers to "assess a uniform toll charge for rehandling material at the disposal area to recover expenditures for construction, operation, and maintenance of the disposal facilities."

The toll is for use of placement facilities only andin addition to any charge for inspection, supervision and surveys. If you have questions concerning this increase,contact the Operations Support Section, Norfolk District, U.S. Army Corps of Engineers at 757- 201-7017.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas