Home

Los Angeles District

Run scraper

The proposed project is located within San Juan Creek

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The proposed project is located within San Juan Creek, just south of the Highway 74 bridge crossing and adjacent to the Rancho Mission Viejo Riding Park, within the City of San Juan Capistrano, Orange County, California,

The Applicant proposes to remove an existing deteriorated Arizona Crossingwhich wouldtemporarily impact 0.32 acre within San Juan Creek. Furthermore, the Applicant intends to dischargefill material into waters of the United States for bank stabilization along 1,300 feet of the southern bank of San Juan Creek, adjacent to the Rancho Mission Viejo Riding Park, with the intent ofstabilizing the bank to limit erosion. Bank stabilization includes permanent impacts to 0.11 acre ofnon-wetland waters of the United States, and temporary impacts to 0.39 acre of non-wetland waters of the United States.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas