Proposal to conduct periodic dredging of up to 150,000 cubic yards of sand per year (over a 10 year period) in and around the intake and discharge canals associated with the Midwest Generation, LLC’s Waukegan Generating Station. Located at 401 E. Greenwood Avenue, Waukegan, Lake County, Illinois.

PUBLIC NOTICE

APPLICATION FOR PERMIT

U.S. Army

Corps of Engineers

Chicago District

Public Notice/Application Number: LRC-2002-21798

Comment Period BEGINS: June 15, 2020

Comment Period Expires: July 15, 2020

U.S. Army Corps of Engineers

Applicant

Robert Huschak

Midwest Generation, LLC

401 East Greenwood Avenue

Waukegan, Illinois 60087

Proposed Action

Proposal to conduct periodic dredging of up to 150,000 cubic yards of sand per year (over a 10 year period) from the area in and around the intake and discharge canals associated with the Midwest Generation, LLC’s Waukegan Generating Station. A detailed description of this proposal is provided on page 2 of this notice.

Location of Proposed Action

Located at 401 E. Greenwood Avenue, Waukegan, Lake County, Illinois (NE Quarter of Section 15, Township 45 N, Range 12 E) (Latitude 42.38100, Longitude -87.81000).

Interested parties are hereby notified that an application has been received for a Department of the Army permit for the activity described herein and as shown on the attached drawings. You are invited to provide your comments by July 15, 2020, on the proposed work, which will become part of the record and will be considered in the decision. A permit will be issued or denied under Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403).

Written comments shall be mailed to:

U.S. Army Corps of Engineers

Chicago District, Regulatory Branch

Attn: LRC-2002-21798,Kaitlyn A. Pascus

231 South LaSalle Street, Suite 1500

Chicago, Illinois 60604-1437

It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address, and email address, if available of the individual commenting, and must be received by the close of the public notice period. Electronic comments may be sent to the project manager at Kaitlyn.A.Pascus@usace.army.mil.

Project Description

The applicant is proposing to conduct mechanical maintenance dredging of up to 150,000 cubic yards of sand per year (over a 10 year period) from the inlet and outflow channels of the Waukegan and adjacent portions of Lake Michigan. Specifically, the area to be dredged includes the intake canal/pond, discharge canal, and an area within a 900-foot radius of the pier adjacent to the intake canal. This area would be dredged to maintain a water depth of 10 feet.

All material is proposed to be disposed of in an adjacent upland storage site until the final disposal location is handled in accordance with IEPA’s requirements. The dredge spoil site is a designated storage area that has been diked to retain drainage and prevent drainage from flowing out. Drainage from the dredging is managed through MWG’s on-site wastewater system, which is under an existing NPDES permit and leaves the system via an existing permitted outfall. There is no proposed return flow back into waters of the U.S and no proposed discharge of fill material into waters of the U.S.

Avoidance & Minimization

The applicant has stated the following concerning avoidance and minimization of impacts to Waters of the United States: N/A

Mitigation

The applicant has stated the following concerning compensatory mitigation for unavoidable impacts to Waters of the United States: N/A

The Corps has not verified the adequacy of this mitigation proposal at this time and will make the final determination on whether the proposed mitigation is appropriate and practicable in accordance with 33 CFR Part 332.

Regulatory Authority This proposed action will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899.

Jurisdiction

This application will be reviewed according to the provisions of Section 10 of the Rivers and Harbors Act of 1899.

Evaluation Factors

The decision whether to issue a permit will be based on an evaluation of probable impact including cumulative impacts of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments.

All factors which may be relevant to the proposal will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, historic properties, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership and, in general, the needs and welfare of the people. In addition, if the proposed activity involves the discharge of dredged or fill material into waters of the United States, the evaluation of the impact on the public interest will include application of Section 404(b)(1) guidelines (40 CFR 230) promulgated by the U.S. Environmental Protection Agency.

The Corps of Engineers is also soliciting comments from the public, Federal, state and local agencies, Indian tribes, and other interested parties in order to consider and evaluate the potential impacts of the proposed activity. Once this office completes a review of the comments received, it will be determined whether to issue, modify, condition, or deny a permit for this proposal.

To prepare this decision, comments are taken into consideration to assess impacts on the public interest factors listed above, as well as endangered species, historic properties, water quality, and general environmental effects. Comments will be used in the preparation of an Environmental Assessment and/or Environmental Impact Statement pursuant to the National Environmental Policy Act. A determination concerning the need for a public hearing will also be based on the comments received.

Preliminary Evaluation of Selected Factors

Department of Natural Resources:

The applicant has applied to the Illinois Department of Natural, Office of Water Resources (IDNR-OWR) for a permit pursuant to the State of Illinois Rivers, Lake and Streams Act (615 ILCS 5). Comments concerning the IDNR-OWR permit should be addressed to the following agency, along with a copy of the comments provided to the Corps of Engineers:

Illinois Department of Natural Resources

Office of Water Resources

Michael A. Bilandic Building

160 N. LaSalle Street, Suite S-700

Chicago, IL 60601

If you have any questions please contact the IDNR at (312) 793-5947.

Endangered and Threatened Species:

The Corps of Engineers has determined that the proposed activity may affect a Federally-listed endangered/threatened species or designated critical habitat. Consultation with the U.S. Fish and Wildlife Service pursuant to Section 7 of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.) will be initiated.

Historic Properties/Cultural Resources:

Preliminary review indicates that the proposed activity is not likely to adversely affect any historic property which is listed, or eligible for listing, on the National Register of Historic Places.

Environmental Impact Statement

A preliminary determination has been made that an environmental impact statement is not required for the proposed work.

Public Hearing

Any person may request in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for public hearing shall state with particularity the reasons for holding a public hearing. A request for a hearing may be denied if substantive reasons for holding a hearing are not provided or if there is otherwise no valid interest to be served.

It should be noted that materials submitted as part of the permit application become part of the public record and are thus available to the general public under the procedures of the Freedom of Information Act (FOIA). Individuals may submit a written request to obtain materials under FOIA or make an appointment to view the project file at the Chicago District Corps of Engineers Office of Counsel.

Interested parties wishing to comment on the proposed activity must do so in writing no later than July 15, 2020. It is presumed that all parties receiving this notice will wish to respond to this public notice; therefore, a lack of response will be interpreted as meaning that there is no objection to the project as described.

This public notice is not a paid advertisement and is for public information only. Issuance of this notice does not imply Corps of Engineers endorsement of the project as described.

If you have any questions, please contact Kaitlyn A. Pascusat (312) 846-5533, or email at Kaitlyn.A.Pascus@usace.army.mil. It should be noted that ALL comments received by this office (via hard copy or electronic) will only be accepted with the full name and address of the individual commenting. You can also visit our website at http://www.lrc.usace.army.mil/Missions/Regulatory.aspx for more information on our program.

NOTICE TO POSTMASTERS:

It is requested that this notice be conspicuously and continuously posted until July 15, 2020.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas