PROPOSED NATURAL GAS PIPELINE IN RED RIVER, DESOTO, SABINE, VERNON, BEAUREGARD, AND CALCASIEU PARISHES
Name of Applicant: Enable Gulf Run Transmission, LLC, c/o SWCA Environmental Consultants, Attn: Mr. Scott Urwick, 10245 West Little York Road, Suite 600, Houston, Texas 77040
Location of Work: The proposed 134-mile pipeline project is located within the Fort Worth, Vicksburg, New Orleans, and Galveston Districts, and begins at Lat. 32.198337, Long. -93.484174 in Red River Parish and terminates at Lat. 30.360089, Long. -93.605041 in Calcasieu Parish, Louisiana, as shown in the attached drawings.
Character of Work: The applicant has requested Department of the Army authorization to install and operate a 42-inch diameter natural gas transmission pipeline approximately 134 miles in length. The pipeline facilities include the proposed 134 mainline section beginning at Westdale, Louisiana and terminating near Starks, Louisiana. The project also involves the construction of seven mainline valves, a pig trap, and meter station along the pipeline route. The project activities include clearing the right-of-way, conducting trenching operations, installing various above and below ground pipelines and components, installing aboveground facilities, temporarily stockpiling materials, and performing horizontal directional drilling (HDD) operations. Following construction, areas temporarily impacted by the project will be restored to pre-construction grade and allowed to revegetate to their pre-existing habitat conditions.