PROPOSED REFINING PIPELINE PROJECT IN CALCASIEU PARISH

NAME OF APPLICANT: Targa Downstream, LLC, c/o: SWCA Environmental Consulting, 5745 Essen Lane, Suite 105, Baton Rouge, LA 70810.

LOCATION OF WORK: The project is centered at Longitude 30.1675951, Latitude -93.3504972, located in Calcasieu Parish, Louisiana, as shown within the attached drawings.

CHARACTER OF WORK: The proposed construction of a 6" refining pipeline approximately 3.54-miles in length, to include a 4,370-ft HDD crossing under the Calcasieu River, from the Targa Downstream, LLC facility off of LA HWY 1133 to Targa Tank Farm facility south of Lake Charles, Calcasieu Parish, Louisiana. Approximately 1.2 acres of jurisdictional wetlands and/or waterbottoms would be impacted. The applicant proposes to purchase necessary credits from a Corps approved mitigation bank to mitigate the project’s impacts to wetland resources, should a DA permit be issued.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas