T-WALL CONSTRUCTION AT THE KELLOGG PUMP STATION IN ST. CHARLES PARISH

NAME OF APPLICANT: St. Charles Parish Department of Public Works, c/o GCR, Inc., Attn: Leslie Johns Ray, 3300 W. Esplanade Ave., Metairie, LA 70002

LOCATION OF WORK: At approximately Latitude: 29.896226, Longitude: -90.36402, at the Kellogg Pump Station, in Luling, in St. Charles Parish, Louisiana, as shown on the enclosed drawings.

Hydrologic Unit Code: 08090301 (Lower Mississippi-Central Louisiana Coastal)

CHARACTER OF WORK: Placement of approximately 1,400-cubic yards of native earthen fill material, approximately 100-cubic yards of hauled-in earthen fill material, approximately 480-cubic yards of sand, approximately 480-cubic yards of rock/limestone, and approximately 62-cubic yards of concrete to facilitate the construction of a T-wall in front of the existing Kellogg Pump Station for structure protection. The T-wall is proposed to tie into the previously permitted and existing Ellington Levee system. No additional wetland impacts are proposed as a result of the T-wall installation, therefore, no compensatory mitigation is proposed.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas