Proposed discharge of fill material into waters of the United States to facilitate widening and improvements on a segment of SR-462 (Northwest Connector) from SR-28 (US-127) to SR-298 (Genesis Road), in Crossville, Cumberland County, Tennessee. TDOT Project No. 18462-1201-14. TDOT PIN 104963.01.

Public Notice No. 20-39 Nashville District Application No. LRN-2018-00391 Date: July 2, 2020; Expires: August 2, 2020

Please address comments to: Nashville District Corps of Engineers Regulatory Division 501 Adesa Parkway, Suite 250, Lenoir City, Tennessee 37771

SUBJECT: Proposed discharge of fill material into waters of the United States to facilitate widening and improvements on a segment of SR-462 (Northwest Connector) from SR-28 (US-127) to SR-298 (Genesis Road), in Crossville, Cumberland County, Tennessee. TDOT Project No. 18462-1201-14. TDOT PIN 104963.01.

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army (DA) Permit pursuant to Section 404 of the Clean Water Act (CWA) for the discharge of fill material into waters of the United States (U.S.). Before a permit can be issued, certification must be provided by the State of Tennessee, pursuant to Section 401(a)(1) of the CWA, that applicable water quality standards will not be violated. The applicant has applied for the required certification.

APPLICANT: Tennessee Department of Transportation 505 Deaderick Street, Suite 900, J.K. Polk Building Nashville, Tennessee 37243

LOCATION: The 1.55-mile project begins near the intersection of Interstate Drive/ Northside Drive (SR-462) with U.S. Highway 127 (SR-28), and ends near the intersection of Interstate Drive with Genesis Road (SR-298), in the City of Crossville. Coordinates of the project beginning and ending are approximately N. 35.9865°, W. 85.0389° and N. 35.9783°, W. 85.0148°, respectively. Waters of the U.S. proposed for impact include Proctor Creek, unnamed tributaries to Proctor Creek, Obed River, Little Obed River, and unnamed wetlands. The project is located within Cumberland County, Tennessee, within the Obed River Watershed (HUC-8: 06010208-Emory).

PROJECT DESCRIPTION: The Tennessee Department of Transportation (TDOT) proposes a connector road at the above described location, by constructing improvements along and widening the existing two-lane Interstate Drive to a five-lane roadway, which will be functionally classified as an urban minor arterial road, with a design speed of 40 mph. The typical roadway cross section includes four 12-foot travel lanes (two in each direction), a continuous 12-foot center turn lane, 4-foot paved shoulders/bike lanes on both sides, curb and gutter, and five-foot sidewalks on both sides within approximately 92 feet of right-of-way. The total proposed length of roadway construction and improvements is 1.63 miles. The estimated time for completing this project is four years. The project scope includes all associated drainage improvements. In order to facilitate the project, the discharge of fill material is proposed within sixteen (16) perennial or intermittent streams, and fifteen (15) wetlands. A total of 5,275 linear feet of streams (0.463 acre) and 1.41 acres of wetland would be permanently impacted by the proposed discharge of fill material related to the roadway improvements. Additionally, the proposal includes the discharge of temporary fill material associated with the installation and maintenance of erosion prevention and sediment control (EPSC) measures. A complete set of project drawings for this public notice is located at: https://www.lrn.usace.army.mil/Media/Public-Notices/

PURPOSE AND NEED: According to the permit application, this project is the third independent segment of an approximately 4.5-mile total length of connector road, designated State Route (SR) 462, from SR-1 (US-70) to SR-298 (Genesis Road). The proposed Northwest Connector project will provide access, improve traffic flow and capacity, relieve traffic congestion, and improve roadway deficiencies. Construction of the proposed project will reduce the need for motorists to travel many of the congested routes along Crossville’s commercial strip, and will improve access to the Crossville Memorial Airport, the Cumberland County Playhouse, and other popular destinations from I-40. The proposed route will have minimal driveway and access points, which offers safer travel to motorists. The proposed project is intended to improve and correct the existing route of Interstate Drive, including its operating characteristics, inadequate traffic capacity, roadway deficiencies, including geometric and structure deficiencies and deficiencies in pavement, pavement width, grade, and drainage. The applicant has determined that this connector road segment is complete and independent, with logical project end points.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: According to the applicant, efforts were made during the planning and design phases of this project to avoid impacts to waters of the U.S. to the extent practicable, and to minimize impacts that were not avoidable. The applicant has examined multiple alternatives to the proposed project. Constructing minor improvements to the existing facility would preserve the existing land use and travel patterns within the corridor with no disruptions, inconveniences, or displacements. However, this alternative was not selected because it would not relieve existing and future traffic flow problems or reduce accident rates; nor would it provide an improved transportation system needed to accommodate future growth and development. According to the applicant, widening the existing roadway is the preferred option and will correct pavement, drainage, and grade deficiencies. During completion of the Environmental Assessment, TDOT examined two alternatives: the “No-Build Alternative” and one “Build Alternative” (the selected alternative). The No-Build Alternative is not proposed by TDOT, since it does not meet the purpose and need of the project. The Build Alternative was selected to satisfy purpose and need.

To minimize impacts to streams and wetlands, the steepest roadway side slopes feasible while maintaining safety are used. The proposed replacement box culvert at STR-3 will be embedded one foot deep within the stream channel, and the proposed replacement box culvert at STR-4 (Proctor Creek) will be embedded two feet deep within the stream channel, all to facilitate the upstream and downstream passage of aquatic species. These embedded structures are proposed to be back-filled with natural creek gravel to the specified embedment depth. Measures to facilitate aquatic species passage are not proposed for structures on the remaining streams; data shows that these stream resources do not currently allow for aquatic species passage because of minimal flow, existing obstructions, or because the streams originate within the project footprint. Any riprap channel protection placed within the stream channels at the inlet or outlet of culverts would be placed to mimic the existing contours of the stream. The top of the proposed riprap would be installed at-grade with the bottom of the stream channel, and voids within the riprap would be filled with creek gravel to prevent stream loss within riprap areas. Staging areas for construction of the bridges are located outside of wetland areas. During the course of design, wetland impacts at WTL-6, WTL-7, and WTL-8 were reviewed and further reduced.

To minimize erosion and avoid sediment release into waters of U.S., three phases of construction are designed and included in the construction plans. Only 50 acres of land disturbance are proposed at any time, and all in-channel construction activities would be completed in the dry and separated from flowing water by using temporary cofferdams, cribs, or stream diversions as appropriate. Standard best management practices (BMPs) will be installed and maintained during roadway construction to reduce the likelihood of erosion and migration of sediment from the project site into adjacent environmental features. High visibility fencing would be installed during construction to ensure that only authorized impacts to waters of the U.S. occur.

COMPENSATORY MITIGATION: To compensate for unavoidable permanent impacts to 5,275 linear feet of streams, the applicant proposes to obtain 856.4 functional feet stream credits from the Mud Creek Stream Mitigation Bank, located in Morgan County, Tennessee, which is currently pending approval by the Interagency Review Team (IRT). The proposed stream impacts would be within the proposed primary service area of this mitigation bank.

To compensate for unavoidable permanent impacts to 1.41 acres of wetland, the applicant proposes debiting, at a 2:1 ratio, 2.82 advanced wetland mitigation credits in the Upper Tennessee River Service Area, from the Tennessee Mitigation Fund (TMF) In-Lieu Fee (ILF) Program. The proposed wetland impacts are within this ILF service area.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines promulgated by the Administrator, Environmental Protection Agency, under authority of Section 404(b)(1) of the CWA (40 CFR Part 230).

SOLICITATION OF COMMENTS: The U.S. Army Corps of Engineers (USACE) is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of the proposed road improvement and widening project. Any comments received will be considered by the USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to NEPA. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. An EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested DA Permit.

HISTORIC AND CULTURAL RESOURCES: TDOT, acting on behalf of the Federal Highway Administration (FHWA), has been identified as the lead agency for complying with Section 106 of the National Historic Preservation Act (NHPA). A Phase I Archaeological Survey of SR-462 from SR-1 (US-70) to SR-298 (Genesis Road) was completed in 2005. No archaeological resources were identified within the project area of this proposal. TDOT submitted the findings of this report to the State Historic Preservation Office (SHPO) on December 13, 2005, indicating that no NRHP listed or eligible archaeological properties would be affected by this proposal. The SHPO concurred with TDOT's findings on December 19, 2005, indicating “we find that the project area contains no archaeological resources eligible for listing in the National Register of Historic Places.”

A historical/architectural assessment was conducted by TDOT for this project, with a report dated May 2004. TDOT historians surveyed the area of potential effect (APE), which includes the USACE’s permit area for this segment of the project, including a SHPO survey records search to determine if any previous architectural surveys had identified any historic properties in the area. The report indicated that no properties in the project area of potential effect are currently included in the NRHP, nor have any been determined eligible for inclusion. On June 1, 2004, TDOT submitted the report to the SHPO, indicating that it was their opinion that the proposed project would have no effect on any National Register eligible properties. The SHPO concurred with this finding on June 8, 2004, indicating “we find that the area of potential effect contains no architectural resources eligible for listing in the National Register of Historic Places affected by this undertaking.” Due to the age of the previous assessment and correspondence, an architectural assessment update was completed by TDOT and submitted to the SHPO on March 15, 2017, indicating their opinion that the original findings remain valid and there are no National Register listed or eligible historic properties that are located within the project’s APE. The SHPO concurred with this finding on March 21, 2017, indicating “we find that no architectural resources eligible for listing in the National Register of Historic Places will be affected by this undertaking.”

USACE invites responses to this public notice from Native American Tribes or tribal governments; federal, state, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and sites of religious and cultural significance at or near the project area. Any substantive comments from this public notice will be provided to TDOT, for consideration of potential effects to historic and cultural resources for Section 106 compliance. If USACE/TDOT determines that consultation is required, USACE/TDOT would consult with the Tennessee Historic Commission (SHPO) and Native American Tribes in accordance with Section 106 of the National Historic Preservation Act, as appropriate. TDOT is required to submit all applicable Section 106 documentation to USACE prior to final permit decision.

ENDANGERED/THREATENED SPECIES REVIEW: TDOT, acting on behalf of the Federal Highway Administration (FHWA), has been identified as the lead agency for conducting environmental review under Section 7 of the ESA. TDOT completed an Endangered Species Act (ESA) records review, by searching the TDEC Division of Natural Areas, Endangered Species Database, on January 29, 2015, December 23, 2019, and March 3, 2020. Additionally, the applicant conducted ESA field reviews in January 2015. Accordingly, effects determinations were made by the applicant for each species. The field review, records review, and accompanying effects determinations provide documentation of the potential effects of the project on endangered and threatened federally listed species within the action area. Listed species potentially located within a four-mile radius of the project site include:

Species Nomenclature

Federal Status

Mammals

Indiana bat (Myotis sodalis)

Endangered

Northern long-eared bat (Myotis septentrionalis)

Threatened

The above described ESA documentation was provided to the USFWS for consultation. In order to determine the presence of bats, a mist netting survey was performed between June 30 and July 1, 2016, at one site along the project corridor. Efforts resulted in the capture of four bats, representing two non-listed bat species. The survey information was provided to the U.S. Fish and Wildlife Service (USFWS) on September 20, 2016. On October 11, 2016, the USFWS concurred with TDOT’s determination of “not likely to adversely affect” for the Indiana bat and northern long- eared bat based on the negative survey results. The USFWS also wrote “based on the best information available at this time, we believe that the requirements of section 7 of the Endangered Species Act (Act) of 1973, as amended, are fulfilled for all species that currently receive protection under the Act.” Based on the 2018 Range-Wide Indiana Bat Survey Guidelines, TDOT re-coordinated with the USFWS on multiple projects via a letter on February 26, 2019. On February 27, 2019, the UFWS responded “In light ofthe fact that each of the surveys were negative for the presence of Indiana bat and northern long-eared bat, we concurred with TDOT’s determinations of “not likely to adversely affect” at that time and provided our project section 7 clearance. As per the 2018 referenced guidance, each of these bat surveys is now valid until April 1, 2022, and our corresponding project section 7 clearances are still in effect.”

OTHER APPROVALS: Before a permit may be issued, water quality certification must be provided by the Tennessee Department of Environment and Conservation (TDEC) pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated. Other federal, state, and/or local approvals may be required for the proposed work.

REQUEST FOR PUBLIC HEARING: Any person may request a public hearing. The request must be submitted in writing to the District Engineer within the designated comment period of the notice and must state the specific reasons for requesting the public hearing.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the administrative record and will be considered in the determination.Any response to this notice should be directed to John Price, Nashville District Corps of Engineers, Regulatory Division, at the above address, at 865-986-7296, or via email: john.c.price@usace.army.mil.

/s/

Joshua W. Frost Chief, Technical Services Branch Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas