Home

Philadelphia District

Run scraper

The applicant

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant, New Jersey Department of Transportation – Office of Maritime Resources, has requested Department of the Army authorization to perform ten (10)-year maintenance dredging. The location of the proposed work is Sunflower Island, City of Brigantine, Atlantic County, New Jersey. All resultant dredged material, estimated to total approximately 38,165.0-cubic yards of predominantly coarse-grained sediment (i.e. greater than 70% sand), will be hydraulically pumped via pipeline and discharged at existing sand shoals off Sunflower Island for enhancement of shallow water habitat. The stated purpose of this project is to restore and maintain safe navigational depths for transiting recreational and emergency vessels; and enhancement of shallow water habitat by reutilization of dredged material within the “back bay” system. More details are available in the "Public Notice" document. Comments are due by Aug. 7, 2020.

The applicant, New Jersey Department of Transportation – Office of Maritime Resources, has requested Department of the Army authorization to perform ten (10)-year maintenance dredging. The location of the proposed work is Sunflower Island, City of Brigantine, Atlantic County, New Jersey. All resultant dredged material, estimated to total approximately 38,165.0-cubic yards of predominantly coarse-grained sediment (i.e. greater than 70% sand), will be hydraulically pumped via pipeline and discharged at existing sand shoals off Sunflower Island for enhancement of shallow water habitat. The stated purpose of this project is to restore and maintain safe navigational depths for transiting recreational and emergency vessels; and enhancement of shallow water habitat by reutilization of dredged material within the “back bay” system. More details are available in the "Public Notice" document. Comments are due by Aug. 7, 2020.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas