Proposed discharge of fill material into streams and wetlands to stabilize an existing overburden slope failure and support expansion of overburden capacity area within Vulcan Benton County Quarry, located in Holladay, Benton County, Tennessee

Public Notice No. 20-21 Nashville District Application No. LRN-2004-01092 Date: July 10, 2020;Expires: August 10, 2020

Please address all comments to: Nashville District U.S. Army Corps of Engineers (USACE), Regulatory Branch (Attn: Amy Robinson), 3701 Bell Road, Nashville, TN 37214, email: amy.m.robinson@usace.army.mil

SUBJECT: Proposed discharge of fill material into streams and wetlands to stabilize an existingoverburden slope failure and support expansion of overburden capacity area within Vulcan Benton County Quarry, located in Holladay, Benton County, Tennessee

TO ALL CONCERNED: The application described below has been submitted for a Department of the Army Permit (DA) pursuant to Section 404 of the Clean Water Act (CWA) for the discharge of fill material into waters of the United States. Before a permit can be issued, certification must be provided by the state of Tennessee, pursuant to Section 401(a)(1) of the CWA, that applicable water quality standards will not be violated, the applicant has applied for the required certification.

APPLICANT: Vulcan Materials Company (Vulcan) C/O Ms. Holly Brunson 115 East Park Drive, Suite 100 Nashville, Tennessee 37027

LOCATION: Within the existing Vulcan Benton County Quarry in unnamed tributaries and wetlands to Little Wolf Creek, located at 8595 State Road, Holladay, Benton County, Tennessee (latitude 35.861315; longitude-88.112445). USGS Quadrangle Maps Rockport and Sugar Tree, TN

DESCRIPTION: The applicant is requesting to discharge fill material into approximately 1,471.30 linear feet of unnamed tributaries (566.70 linear feet of perennial streams and 904.71 linear feet of intermittent streams) and 2.54 acres of wetlands within their existing quarry, known as Vulcan Benton County Quarry. The proposed project serves two purposes. One is to improve stability of an existing overburden stockpile where a slope failure recently occurred and second is to increase the overburden capacity and stormwater detention storage for the long-term operations of the facility. Proposed impacts to streams and wetlands with compensatory mitigation calculations are provided below.

Plans of the proposed work are attached to this notice. If you wish to view additional plans, please contact this office or visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx.

COMPENSATORY MITIGATION, PRELIMINARY MITIGATION PLAN: The applicant has proposed compensatory wetland mitigation through the purchase of 531.58 stream functional feet mitigation credits from the Center Point Mitigation Bank. The following table provides a summary of proposed stream impacts and compensatory mitigation

Reach

Impact Type

Stream Type

Linear Feet

ECS Scores

Functional Feet

Tier 5 Functional Loss

Lat/Long Start of Reach

2

Tier 5, Full Encapsulation

Intermittent/Perennial

258.54

0.46

118.9284

104.65

35.860668/

-88.108072

3

Tier 5, Full Encapsulation

Intermittent/Perennial

281.32

0.4

112.528

99.02

35.861303/

-88.108137

4

Tier 5, Full Encapsulation

Intermittent/Perennial

266.08

0.4

106.432

93.66

35.862241/

-88.108128

4a

Tier 5, Full Encapsulation

Intermittent/Perennial

98.77

0.4

39.508

34.77

35.864378/

-88.107421

5

Tier 5, Full Encapsulation

Intermittent/Perennial

566.70

0.40

226.68

199.48

35.862851/

-88.108524

Total Functional Feet Required:

531.58

compensatory mitigation for 2.54 wetland impacts through purchase of 5.08 in-lieu credits (2:1 ratio) from the Tennessee Mitigation Fund through the Tennessee Wildlife Foundation. The following table provides a summary of proposed wetland impacts and compensatory mitigation:

Wetland ID

Wetland Type

Proposed Impact Type

Proposed Impact Area Acres (ac)

Proposed Mitigation ILF Credits

Lat/Long

WMA

Palustrine Forested

Fill

0.31 ac

0.62

35.86518/ -88.10956

WK

Palustrine Forested

Fill

1.47 ac

2.94

35.8606 / -88.10810

WL

Palustrine Forested

Fill

0.44 ac

0.88

35.86392/ -88.10701

WM

Palustrine Forested

Fill

0.13 ac

0.26

35.86436/ -88.10819

WN

Palustrine Forested

Fill

0.01 ac

0.02

35.86158/ -88.10538

WO

Palustrine Forested

Fill

0.15 ac

0.30

35.86126/ -88.10560

WP

Palustrine Forested

Fill

0.03 ac

0.06

35.86172/ -88.10597

Totals:

2.54 ac

5.08 ILF

PURPOSE AND NEED: The applicant stated that the purpose of the proposed project is to stabilize a stockpile/overburden area that cannot be used because of an existing slope failure possess a safety concern. The applicant has conducted surveys of the slope failure have been conducted weekly to monthly since the initial failure occurred in September 2018.

During the past 20 months, the velocity of the slide across different sections of the pile has been up to approximately 0.02 inches/day. Additionally, the project would allow expansion of the existing stockpile site. The applicant indicates while reconstructing the side slope is the primary concern and the responsibility of the applicant, it will also provide additional storage capacity for overburden that is crucial for continued, long-term operations.

AVOIDANCE AND MINIMIZATION OF IMPACTS TO WATERS OF THE U.S.: The proposed project site is located adjoining and within the property boundaries of the applicant’s existing quarry, Vulcan Benton County Quarry. Portions of the project site and the surrounding area have been historically disturbed from past quarry and logging practices. The proposal is located within an 83-acre tract of land located within the southeastern portion of the Quarry boundary. An alternative analysis was provided with the application evaluating design options for the proposed projects. The project design avoided 4.12 acres of wetlands and 2,741.5 linear feet of streams (2,408.4 linear feet of perennial streams and 333.1 linear feet of intermittent streams) located within the property boundary. The applicant stated total avoidance of impacts for slope stabilization of the existing stockpile and for prevention of future slope failures is not practicable due to the terrain and location of the streams and wetlands. Proper stability could not be achieved without impacting a portion of theaquatic resources within the project area. For this portion of the project, off-site options are not available. For the expansion portion, alternative onsite designs were investigated to identify practicable alternatives that avoid and/or minimize impacts. Additionally, an offsite option was investigated for the proposed expansion.

PUBLIC INTEREST REVIEW/CUMULATIVE EFFECTS: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefit, which reasonably may be expected to accrue from the work, must be balanced against its reasonably foreseeable detriments. All factors, which may be relevant to the work, will be considered including the cumulative effects thereof; among those are conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, floodplain values, land use, navigation, shore erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, considerations of property ownership, and, in general, the needs and welfare of the people.

SOLICITATION OF COMMENTS: USACE is soliciting comments from the public; federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. Any comments received will be considered by USACE to determine whether to issue, modify, condition, or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historical properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment (EA) and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. If necessary, an EA will be prepared by this office prior to a final decision concerning issuance or denial of the requested DA Permit.

HISTORIC AND CULTURAL RESOURCES: The proposed work involves ground disturbance of 68.9 acres within the 83-acre tract of land for the slope stability and overburden area expansion. In 2018, the applicant had a desk-based assessment performed for the permit area. The results of the desk-based assessment resulted in that no previously recorded National Register Historic Places (NRHP) eligible or listed properties were identified within or in the immediate vicinity of the permit area. A Phase I archaeological survey of the previously undisturbed areas will be required.

This notice serves to initiate the public involvement requirements of Section 106 of the National Historic Preservation Act of 1966, as amended. The Corps invites responses to this public notice from American Indian Tribes or tribal governments; Federal, State, and local agencies; historical and archeological societies; and other parties likely to have knowledge of or concerns regarding historic properties and areas of cultural significance at or near the project area. Anysubstantive comments would be considered to determine the potential of impacts of the project to historic properties and would initiate any required consultation with the State Historic Preservation Officer (SHPO) and American Indian Tribes in accordance with Section 106 of the National Historic Preservation Act.

ENDANGERED/THREATENED SPECIES REVIEW: A review of USFWS’s Information for Planning and Conservation (IpaC) website (http://ecos.fws.gov/ipac/) identified the following federally-listed Threatened (T) and/or Endangered (E) species that may occur or could potentially be affected by the activities in this location:

Group

Name

Status

Clams

Pink Mucket (Lampsilis abrupta)

E

Mammal

Indiana bat (Myotis sodalis)

E

Mammal

Gray bat (Myotis grisescens)

E

Mammal

Northern Long-Eared Bat

(Myotis septentrionalis)

T

No designated critical habitat areas were identified.

An acoustic survey was performed to determine the presence of the Indiana Bat and NorthernLong-Eared Bat (NLEB) within the quarry property. The survey was conducted on July 28-30, 2017, and the results suggest that the Indiana bat and NLEB are likely absent. The applicant previously coordinated the proposal with the U.S. Fish and Wildlife Service (USFWS) identifying the above four T&E species. On May 22, 2020, USFWS responded that based on the site location and habitat conditions, they determine the project plan adequately addresses potential direct, indirect, and cumulative effects to federally listed species and their habitats (FWS #2020-I-1209, HHNT Project No. 8020-013).

The Endangered Species Act (ESA) requires federal agencies to consult with the U.S. Fish and Wildlife Service (USFWS) pursuant to Section 7 of ESA on all actions that may affect a species listed under the ESA as threatened or endangered or any designated critical habitat. A copy of the notice is being furnished to the USFWS for their review. This public notice serves as coordination with the USFWS of the ESA of 1972 (as amended). Per this notification, we request comments from the USFWS concerning potential impacts to T&E species. After receipt of comments, USACE will evaluate the potential effects on proposed and/or listed species and their designated critical habitat and initiate consultation with USFWS, if required.

OTHER APPROVALS: In addition to the DA permit, other federal, state, and/or local approvals may be required for the proposed work include, but not limited to: Before a permit can be issued, water quality certification must be provided by the state ofTennessee Department of the Environment and Conservation (TDEC), pursuant to Section 401(a)(1) of the CWA (33 U.S.C. 1341), that applicable water quality standards will not be violated. The applicant has submitted an application to TDEC and their review is pending.

TDEC, Division of Water Resources Mining Section, issued a draft National Pollution Elimination Discharge System (NPDES) on July 2, 2019 for the proposed project [TN0003107]. Recently, the NPDES permit was updated and modified to include areas of the stockpile expansion.

Other federal, state, and/or local approvals that may be required for the proposed work.

PUBLIC HEARING REQUESTS: Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. Requests for hearings shall state, with particularity, the reasons for holding a hearing.

COMMENT PERIOD: Written statements received in this office within 30 days from the date of this notice will become a part of the record and considered in the determination. Any response to this notice should be directed to the Regulatory Division, Attention: Amy Robinson at email: amy.m.robinson@usace.army.mil.

If you received this notice by mail and wish to view all of the diagrams, visit our web site at: http://www.lrn.usace.army.mil/Media/PublicNotices.aspx, or contact Ms. Robinson at the above email.

/s/

Timothy C. Wilder Chief, West Branch Regulatory Division U.S. Army Corps of Engineers

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas