Home

Galveston District

Run scraper

SWG-2016-00744 - Tubal-Cain Marine Services

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

This is an After-the-Fact permit application.

Full Public Notice Project Plans TCEQ Tier II Questionnaire & Alternatives Analysis

PROJECT DESCRIPTION: This is an After-the-Fact permit application. The applicant installed 3,444’ - 8” of steel sheet pile bulkhead, 65 mooring piles, dredged approximately 21,000 cubic yards of material from approximately 3.56 acres of unvegetated water bottom and placed approximately 5,839 cubic yards of fill behind the bulkhead below mean high tide (approx. 1.09 acre). The dredged material was deposited onsite in uplands and transported offsite for upland disposal.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas