You can copy from here when filling out the rest of the page.
WATERWAY CLOSURE IN TERREBONNE PARISH, LOUISIANA
NAME OF APPLICANT: Shell Pipeline Company LP, c/o: Jacobs Engineering, attn..: Ms. Monica Stochl, 1515 Poydras Street, Suite 1260, New Orleans, LA 70112.
LOCATION OF WORK: Latitude 29.234542/Longitude: -91.070308, Hydrologic Unit Code: 080903020406-Oyster Bayou-Frontal Gulf of Mexico. Section 13, Township 21 South, Range 13 East, Hellhole Bayou, Terrebonne Parish, Louisiana, as shown in the attached drawings.
CHARACTER OF WORK: The applicant proposes to install a fixed crest weir structure and fourteen (14) Eco-Bales in East Hellhole Bayou, to cease erosion and to protect a pipeline that crosses the canal. The weir structure will have treated wood pilings with a sheetpiling and ecobale system installed vertically across the canal, along with the deposition of rip rap for structural support. The proposed project will result in a permanent waterway closure to vessels. If a Department of the Army permit is warranted, the applicant has proposed to mitigate for any unavoidable wetlands impacts at an approved and acceptable mitigation bank within the N.O. District.