Home

Nashville District

Run scraper

Navigation Notice 20-30: Intermittent closure of Chickamauga Lock scheduled Aug. 11-12

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Intermittent closures are expected on the lower end of Chickamauga Lock at Tennessee River mile 471 due to a survey 7 a.m. to 5 p.m. Aug. 11 and 7 a.m. to 1 p.m. Aug. 12. No lockage on either day will be started that cannot be completed by 7 a.m. Contact the lock at 423-875-6230 for more information.

Intermittent closures are expected on the lower end of Chickamauga Lock at Tennessee River mile 471 due to a survey 7 a.m. to 5 p.m. Aug. 11 and 7 a.m. to 1 p.m. Aug. 12. No lockage on either day will be started that cannot be completed by 7 a.m. Contact the lock at 423-875-6230 for more information.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas