The application is for the discharge of fill material into Jap Beaver Lake. The activity includes spillway structure replacement, boat ramp maintenance, construction of approximately six, 100 foot long jetties, and approximately 5,000 feet of bank stabilization.
The applicant proposes to draw the lake down to 10-20 acres to expose sufficient basin to make repairs. Once the lake level has been reduced, relocate
sediment from the lake basin to create new jetties (approximately 6 jetties, 100 feet long and 44 feet wide at the base) and to repair/armor shorelines. The jetties will act as a wind break and reduce further bank erosion. The jetties will be armored with rip rap to prevent erosion and sloughing of the relocated sediment. Approximately 5000 feet of shoreline will be repaired and bank stabilization measures (proper slope, establishing native rooted aquatic vegetation) will be used. Dam repairs will include the installation of a new primary spillway structure will be completed by a contractor with plans and oversight provided by Garver Engineering. The applicant proposes to use heavy equipment to reshape existing shorelines to proper 2:1 slope to repair extended shallow flats and provide optimal habitat for fishes and aquatic vegetation. Sediment removal from the basin will increase the open water habitat available for pelagic fishes. Sediment removal will also expose buried nutrients which will help boost the initial food web productivity when the lake refills. The applicant proposes to extend and repair existing boat ramp by lengthening the existing concrete boat ramp by 20 feet and widening the boat ramp to a total width of 19 feet. Crushed rock base material will be used under the concrete in the new sections.