Bubba’s Marine Construction, LLC, is replacing a mooring cell at the Port of Decatur at Tennessee River mile 304 Sept. 14 through Dec. 30, 2020. There are two barges (140-foot by 40-foot and 120-foot by 30-foot) as well as a 45-foot tug boat named the “Long John” conducting the work. They are mooring on site for the duration of the construction. The “Long John” is monitoring marine channels 13 and 8 during construction. For more information, contact Bubba Doss at 256-335-8900.

Bubba’s Marine Construction, LLC, is replacing a mooring cell at the Port of Decatur at Tennessee River mile 304 Sept. 14 through Dec. 30, 2020. There are two barges (140-foot by 40-foot and 120-foot by 30-foot) as well as a 45-foot tug boat named the “Long John” conducting the work. They are mooring on site for the duration of the construction. The “Long John” is monitoring marine channels 13 and 8 during construction. For more information, contact Bubba Doss at 256-335-8900.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas