PROPOSED GENERAL PERMIT AUTHORIZING MINOR CONSTRUCTION ACTIVITIES FOR RESIDENTIAL PURPOSES AND THE ASSOCIATED DISCHARGE OF FILL MATERIAL INTO WATERS OF THE UNITED STATES WITHIN THE NEW ORLEANS DISTRICT

This public notice has been republished for 30 days. The original publish date was 8/24/2020; however, it was discoveredthat the public noticewas not accessible to the general public during that time period.

PROPOSED GENERAL PERMIT AUTHORIZING MINOR CONSTRUCTION ACTIVITIES FOR RESIDENTIAL PURPOSES AND THE ASSOCIATED DISCHARGE OF FILL MATERIAL INTO WATERS OF THE UNITED STATES WITHIN THE NEW ORLEANS DISTRICT

General Permits have proven to be an effective method to authorize certain projects within the New Orleans District in a timely manner without the need for a public notice and its related costs. Evaluating applications under the general permit procedures for projects that qualify because of their minor impacts allows for better use of personnel resources, yet still allows adequate impact review. A copy of the general permit is attached.

Interested parties are requested to review the enclosed general permit authorizing minor construction activities for residential purposes and the associated discharge of fill material into waters of the United States within the New Orleans District.

Specific legislation requiring Department of the Army permits for work of this nature are: [ ] Section 10 of the Rivers and Harbors Act of March 3, 1899 (30 Stat. 1151: 33 USC 403); and/or [X] Section 404 of the Clean Water Act (86 Stat. 816: 33 USC 1344).

Application has also been made to the Louisiana Department of Environmental Quality, Office of Environmental Services, for a Water Quality Certification (WQC) in accordance with statutory contained in Louisiana Revised Statutes of 1950, Title 30, Chapter 11, Part IV, Section 2074 A(3) and provisions of Section 401 of the Clean Water Act (P.L. 95-217).

The comment period for the Department of the Army Permit and the Louisiana Department of Environmental Quality WQC will close 30 days from the date of this joint public notice. Written comments, including suggestions for modifications or objections to the proposed work, stating reasons thereof, are being solicited from anyone having interest in this permit and/or this WQC request and must be mailed so as to be received before or by the last day of the comment period. Letters concerning the Corps of Engineers permit application must reference the applicant's name and the Permit Application Number, and be mailed to the Corps of Engineers at the address above, ATTENTION: REGULATORY BRANCH. Similar letters concerning the Water Quality Certification must reference the applicant's name and the WQC Application number and be mailed to the Louisiana Department of Environmental Quality at the address above. The application for this proposed project is on file with the Louisiana Department of Environmental Quality and may be examined during weekdays between 8:00 a.m. and 5:00 p.m. Copies may be obtained upon payment of costs of reproduction.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas