Home

Baltimore District

Run scraper

Comment Period: September 30

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Comment Period: September 30, 2020 to November 16, 2020. Description: The purpose of this 45 day public notice is to request comments on the suspensions and regional conditions applicable to Pennsylvania, Maryland, District of Columbia, and for Fort Belvoir, Fort Myer, and the Pentagon in Virginia that are proposed for the 2020 Nationwide Permits. Contact: Amy Elliott at 814-235-0573 or amy.h.elliott@usace.army.mil.

Public Notice

U.S. Army Corps of Engineers Baltimore District SPN-20-62 Date: September 30, 2020 to November 16, 2020 Baltimore District Philadelphia District Pittsburgh District Enclosure 1-Final SuspensionsDraftEnclosure 2-MD Draft Enclosure 3-PA Draft Enclosure 4-DC Draft

DISTRICT PUBLIC NOTICE - PROPOSAL

NATIONWIDE PERMIT REISSUANCE REQUEST FOR COMMENTS

On September 15, 2020, the U.S. Army Corps of Engineers published in the Federal Register its proposal to reissue the 52 existing nationwide permits (NWPs) and issue five new NWPs.

Nationwide permits are general permits issued on a nationwide basis to streamline the authorization of activities that result in no more than minimal individual and cumulative adverse environmental effects. Many of the proposed NWPs require notification to the District Engineer before commencing those activities, to ensure that the activities authorized by those NWPs cause no more than minimal individual and cumulative adverse environmental effects.

National Issues Concerning the Proposed NWPs: The Federal Register notice is the public’s opportunity to comment on the proposed NWPs, general conditions, and definitions. Comments on national issues relating to these NWPs should be submitted to docket number COE-2020-0002 at www.regulations.gov, or by email to nationwidepermits2020@usace.army.mil or by mail to Headquarters, U.S. Army Corps of Engineers, Directorate of Civil Works, ATTN: CECW-CO-R, 441 G Street, N.W., Washington, D.C. 20314-1000. Instructions for submitting comments are provided in the September 15, 2020 Federal Register notice. Comments on the proposed NWPs are due by November 16, 2020.

Regional Issues Concerning the Proposed NWPs, Including Regional Conditioning: Division Engineers are authorized to add regional conditions specific to the needs and/or requirements of a particular region or state. Regional conditions are an important mechanism to help ensure that the adverse environmental effects of activities authorized by the NWPs are no more than minimal, both individually and cumulatively. Division Engineers may also suspend or revoke specific NWPs in certain geographic areas (e.g., states or watersheds) or high-value aquatic systems where the adverse environmental effects caused by activities authorized by those NWPs may be more than minimal. An enclosure for this public notice (Enclosure 1- 4) lists the proposed regional conditions currently under consideration by the Corps Great Lakes and Ohio River Division and the North Atlantic Division for the State of Maryland, the Commonwealth of Pennsylvania, the District of Columbia, and for Fort Belvoir, Fort Myer, and the Pentagon in Virginia. The Baltimore, Pittsburgh, and Philadelphia Corps Districts are seeking comments on the proposed regional conditions and seeking comments on the need for additional regional conditions to help ensure that the adverse environmental effects of activities authorized by the proposed NWPs are no more than minimal, individually and cumulatively. Unless otherwise noted, all proposed regional conditions listed on this enclosure are applicable for activities in the State of Maryland, the Commonwealth of Pennsylvania, the District of Columbia, and for Fort Belvoir, Fort Myer, and the Pentagon in Virginia. Comments on regional issues relating to the proposed NWPs and proposed regional conditions should be sent to U.S. Army Corps of Engineers, Baltimore District, State College Field Office, 1631 South Atherton Street, Suite 101, State College, Pennsylvania, 16801, Attn: Mrs. Amy Elliott or via email at amy.h.elliott@usace.army.mil. Comments relating to regional conditions are due by 45 days from September 30, 2020. Similar public notices proposing regional conditions in other regions or states are being published concurrently by other division or district offices. After the final NWPs are issued, the final regional conditions will be issued after they are approved by the Division Commander.

States, tribes, and other certifying authorities will make their Clean Water Act Section 401 water quality certification decisions after reviewing the proposed NWPs. States will make their Coastal Zone Management Act consistency determination decisions after reviewing the proposed NWPs.

Draft decision documents for each of the proposed NWPs, which include environmental documentation prepared for the purposes of the National Environmental Policy Act, have been written by Corps Headquarters. The decision documents will address compliance of the NWPs with the requirements for issuance under the Corps’ general permit authority. These draft decision documents, as well as the proposed NWPs, are available for viewing at www.regulations.gov, docket number COE-2020-0002. Final decision documents will be prepared for the NWPs that are issued.

Enclosed is an index of the proposed NWPs and conditions. Anyone wishing to provide comments may obtain a full text copy of the NWPs through the Corps Home Page at https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/, at www.regulations.gov in docket number COE-2020-0002, or at the following Federal Register address: https://www.federalregister.gov/documents/2020/09/15/2020-17116/proposal-to-reissue-and-modify-nationwide-permits

This public notice is issued by the Baltimore District Chief, Regulatory Branch.

Index of Proposed Nationwide Permits, Conditions, and Definitions

Nationwide Permits

1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities 5. Scientific Measurement Devices 6. Survey Activities 7. Outfall Structures and Associated Intake Structures 8. Oil and Gas Structures on the Outer Continental Shelf 9. Structures in Fleeting and Anchorage Areas 10. Mooring Buoys 11. Temporary Recreational Structures 12. Oil or Natural Gas Pipeline Activities 13. Bank Stabilization 14. Linear Transportation Projects 15. U.S. Coast Guard Approved Bridges 16. Return Water From Upland Contained Disposal Areas 17. Hydropower Projects 18. Minor Discharges 19. Minor Dredging 20. Response Operations for Oil or Hazardous Substances 21. Surface Coal Mining Activities 22. Removal of Vessels 23. Approved Categorical Exclusions 24. Indian Tribe or State Administered Section 404 Programs 25. Structural Discharges 26. [Reserved] 27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities 28. Modifications of Existing Marinas 29. Residential Developments 30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. Temporary Construction, Access, and Dewatering 34. Cranberry Production Activities 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 39. Commercial and Institutional Developments 40. Agricultural Activities 41. Reshaping Existing Drainage Ditches 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. [Reserved] 48. Commercial Shellfish Mariculture Activities 49. Coal Remining Activities 50. Underground Coal Mining Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects 53. Removal of Low-Head Dams 54. Living Shorelines A. Seaweed Mariculture Activities B. Finfish Mariculture Activities C. Electric Utility Line and Telecommunications Activities D. Utility Line Activities for Water and Other Substances E. Water Reclamation and Reuse Facilities

Nationwide Permit General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Birds and Bald and Golden Eagles 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Activities Affecting Structures or Works Built by the United States 32. Pre-Construction Notification

District Engineer’s Decision

Further Information

Definitions Best management practices (BMPs) Compensatory mitigation Currently serviceable Direct effects Discharge Ecological reference Enhancement Establishment (creation) High Tide Line Historic property Independent utility Indirect effects Loss of waters of the United States Navigable waters Non-tidal wetland Open water Ordinary high water mark Perennial stream Practicable Pre-construction notification Preservation Re-establishment Rehabilitation Restoration Riffle and pool complex Riparian areas Shellfish seeding Single and complete linear project Single and complete non-linear project Stormwater management Stormwater management facilities Stream bed Stream channelization Structure Tidal wetland Tribal lands Tribal rights Vegetated shallows Waterbody

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas