The applicant proposes to discharge a 4.379 acres of fill material into wetlands.
Public Notice Project Plans
PROJECT DESCRIPTION: The applicant proposes to discharge a 4.379 acres of fill material into wetlands, and 314 linear feet of fill material into waters of the U.S. during the roadway improvements associated with the reconstruction and widening of SH 332. Specifically, the following impacts are proposed:
SH 332 would be reconstructed and widened from two to four lanes (two lanes in each direction) from FM 521 to FM 2004. The proposed project would also reconstruct and widen SH 332 from four to six lanes (three lanes in each direction) from FM 2004 to SH 288. Roadway improvements would include the replacement of bridges over Buffalo Camp Bayou and a diversion channel just east of Buffalo Camp Bayou. The project would include sidewalks on both sides of the roadway for the entire length of the project. In addition to roadway improvements, improved drainage ditches would be constructed along the north and south sides of the project. Additionally, a new drainage channel is proposed on new location from SH 332, approximately 800 feet west of Division Street (County Road (CR) 680A), south to the Brazos River, a distance of approximately 1.1 miles.