Home

New Orleans District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

TIME EXTENSION FOR PROTECTION LEVEE AND OUTFALL STRUCTURES IN ST. LANDRY PARISH

NAME OF APPLICANT: Alon Refining Krotz Springs, Inc., c/o Keystone Engineering,626 Highlandia Drive, Baton Rouge, Louisiana 70810.

LOCATION OF WORK: Located in St. Landry Parish, Section 15, Township 6 South, Range 7 East, located on River Road, Highway 105, in Krotz Springs, Louisiana, 30.52354, -91.75429, as shown on the attached drawings. Hydrologic Unit 08080101, Atchafalaya Basin.

CHARACTER OF WORK: Permit re-issuance/time extension to construct and maintain a flood protection levee to protect the Krotz Springs Refinery property. The levee improvements will place fill material along either side of existing hesco basket levee that were installed under an emergency permit in 2011. The levee improvements portion of the work was permitted in 2014, but was not installed by the owner before the permit expired. Additional work includes installation and maintenance of two outfall structures at two existing locations. Should a Department of the Army permit be warranted, the applicant has proposed to mitigate any unavoidable wetlands impacts at an approved and acceptable mitigation bank within the New Orleans District.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas