You can copy from here when filling out the rest of the page.
PROPOSED PROPWASHING AND DRILLING OF THE PALO DURO SIDETRACK WELL IN BAYOU SORREL
NAME OF APPLICANT: HILCORP ENERGY COMPANY, c/o Providence Engineering and Environmental Group LLC, 1201 Main Street, Baton Rouge, Louisiana 70764.
LOCATION OF WORK: In Bayou Sorrel and within the Bayou Sorrel Oil and Gas Field, Latitude 30.164803, Longitude -91.361134, in Iberville Parish, within the Atchafalaya Basin in hydrologic unit (HUC 08080101), as shown on the attached drawings.
CHARACTER OF WORK: The applicant has requested a Department of the Army authorization to propwash for access for a drill barge, shell barge, and supply barge for the drilling of the Palo Duro Sidetrack Well. Approximately 210 cubic yards of native material will be temporarily disturbed from the propwashing. Additionally, 8 three-pile clusters will be temporarily placed in waterbottoms for the removal of the drill barge. It is anticipated that the proposed action would have minimal impact on adjacent wetlands.