Home

Nashville District

Run scraper

Shoreline construction is set at Tennessee River Mile 18.8 Jan. 11-22

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Shoreline construction is set at Tennessee River Mile 18.8 Jan. 11-22, 2021. Johnson Brothers is performing geotechnical boring on the right descending bank Monday through Friday during this period from 8 a.m. to 5 p.m. Contractors on site will be monitoring Marine channels 13, 14 and 16. Contact Jamie Willcutt at 205-388-9539 for more information.

Shoreline construction is set at Tennessee River Mile 18.8 Jan. 11-22, 2021. Johnson Brothers is performing geotechnical boring on the right descending bank Monday through Friday during this period from 8 a.m. to 5 p.m. Contractors on site will be monitoring Marine channels 13, 14 and 16. Contact Jamie Willcutt at 205-388-9539 for more information.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas