On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published the notice in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs will go into effect on March 15, 2021, and will expire on March 14, 2026:

On January 13, 2021, the U.S. Army Corps of Engineers (Corps) published a final rule in the Federal Register (86 FR 2744) announcing the reissuance of 12 existing nationwide permits (NWPs) and four new NWPs, as well as the reissuance of NWP general conditions and definitions with some modifications. These 16 NWPs will go into effect on March 15, 2021, and will expire on March 14, 2026:

• NWP 12 – Oil or Natural Gas Pipeline Activities • NWP 21 – Surface Coal Mining Activities • NWP 29 – Residential Developments • NWP 39 – Commercial and Institutional Developments • NWP 40 – Agricultural Activities • NWP 42 – Recreational Facilities • NWP 43 – Stormwater Management Facilities • NWP 44 – Mining Activities • NWP 48 – Commercial Shellfish Mariculture Activities • NWP 50 – Underground Coal Mining Activities • NWP 51 – Land-Based Renewable Energy Generation Facilities • NWP 52 – Water-Based Renewable Energy Generation Pilot Projects • NWP 55 – Seaweed Mariculture Activities • NWP 56 – Finfish Mariculture Activities • NWP 57 – Electric Utility Line and Telecommunications Activities • NWP 58 – Utility Line Activities for Water and Other Substances

The Corps has also issued final decision documents for the new and reissued NWPs. These final decision documents are available at www.regulations.govat docket number COE-2020-0002. Furthermore, the national NWP decision documents will be supplemented by Division Engineers to address decisions concerning the addition of regional conditions to the NWPs.

The 12 existing NWPs published in the January 13, 2021 final rule replace the 2017 versions of these NWPs. The 2017 versions of NWPs 12, 21, 29, 39, 40, 42, 43, 44, 48, 50, 51, and 52 expire on March 14, 2021.

With the publication of this Federal Register notice, Corps divisions will begin finalizing regional conditions for these 16 NWPs. Regional conditions will provide additional protection for the aquatic environment, and will help ensure that the NWPs authorize only those activities with no more than minimal adverse environmental effects. Regional conditions will help ensure protection of high value waters within Virginia.

Corps divisions and districts will also begin determining which conditions for water quality certifications issued by states, tribes, and EPA for the issuance of these NWPs become conditions of these NWPs. Corps divisions and districts will also begin determining which conditions for Coastal Zone Management Act consistency concurrences issued by states for the issuance of these NWPs become conditions of these NWPs. Those regional conditions will be announced in a future public notice issued by the Norfolk District.

There are 40 existing NWPs that were not reissued or modified by the January 13, 2021 final rule. Those 40 NWPs were published in the January 6, 2017, issue of the Federal Register (82 FR 1860) and those NWPs remain in effect until the Corps issues a final rule reissuing those NWPs or March 18, 2022, whichever comes first. The 40 2017 NWPs that remain in effect are: • NWP 1 – Aids to Navigation • NWP 2 – Structures in Artificial Canals • NWP 3 – Maintenance • NWP 4 – Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities • NWP 5 – Scientific Measurement Devices • NWP 6 – Survey Activities • NWP 7 – Outfall Structures and Associated Intake Structures • NWP 8 – Oil and Gas Structures on the Outer Continental Shelf • NWP 9 – Structures in Fleeting and Anchorage Areas • NWP 10 – Mooring Buoys • NWP 11 – Temporary Recreational Structures • NWP 13 – Bank Stabilization • NWP 14 – Linear Transportation Projects • NWP 15 – U.S. Coast Guard Approved Bridges • NWP 16 – Return Water From Upland Contained Disposal Areas • NWP 17 – Hydropower Projects • NWP 18 – Minor Discharges • NWP 19 – Minor Dredging • NWP 20 – Response Operations for Oil or Hazardous Substances • NWP 22 – Removal of Vessels • NWP 23 – Approved Categorical Exclusions • NWP 24 – Indian Tribe or State Administered Section 404 Programs • NWP 25 – Structural Discharges • NWP 27 – Aquatic Habitat Restoration, Establishment, and Enhancement Activities • NWP 28 – Modifications of Existing Marinas • NWP 30 – Moist Soil Management for Wildlife • NWP 31 – Maintenance of Existing Flood Control Facilities • NWP 32 – Completed Enforcement Actions • NWP 33 – Temporary Construction, Access, and Dewatering • NWP 34 – Cranberry Production Activities • NWP 35 – Maintenance Dredging of Existing Basins • NWP 36 – Boat Ramps • NWP 37 – Emergency Watershed Protection and Rehabilitation • NWP 38 – Cleanup of Hazardous and Toxic Waste • NWP 41 – Reshaping Existing Drainage Ditches • NWP 45 – Repair of Uplands Damaged by Discrete Events • NWP 46 – Discharges in Ditches • NWP 49 – Coal Remining Activities • NWP 53 – Removal of Low-Head Dams • NWP 54 – Living Shorelines

The regional conditions for these 40 NWPs that were approved by division engineers in 2017 remain in effect while these 2017 NWPs remain in effect.

The January 13, 2021, Federal Register notice is available for viewing at https://www.federalregister.gov/documents/2021/01/13/2021-00102/reissuance-andmodification-of-nationwide-permits

As an alternative, interested parties can access the January 13, 2021, final rule and related documents at: https://www.usace.army.mil/Missions/Civil-Works/Regulatory-Program-and-Permits/Nationwide-Permits/

[The lists provided below are optional; alternatively, interested parties can examine the 2021 and 2017 final rules published in the Federal Register.]

Index of 2021 Nationwide Permits, Conditions, District Engineer’s Decision, Further Information, and Definitions

Nationwide Permits

12. Oil or Natural Gas Pipeline Activities 21. Surface Coal Mining Activities 29. Residential Developments 39. Commercial and Institutional Developments 40. Agricultural Activities 42. Recreational Facilities 43. Stormwater Management Facilities 44. Mining Activities 48. Commercial Shellfish Mariculture Activities 50. Underground Coal Mining Activities 51. Land-Based Renewable Energy Generation Facilities 52. Water-Based Renewable Energy Generation Pilot Projects 55. Seaweed Mariculture Activities 56. Finfish Mariculture Activities 57. Electric Utility Line and Telecommunications Activities 58. Utility Line Activities for Water and Other Substances

General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Birds and Bald and Golden Eagles 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Activities Affecting Structures or Works Built by the United States 32. Pre-Construction Notification

District Engineer’s Decision

Further Information

Definitions

Best management practices (BMPs) Compensatory mitigation Currently serviceable Direct effects Discharge Ecological reference Enhancement Establishment (creation) High Tide Line Historic property Independent utility Indirect effects Loss of waters of the United States Navigable waters Non-tidal wetland Open water Ordinary high water mark Perennial stream Practicable Pre-construction notification Preservation Re-establishment Rehabilitation Restoration Riffle and pool complex Riparian areas Shellfish seeding Single and complete linear project Single and complete non-linear project Stormwater management Stormwater management facilities Stream bed Stream channelization Structure Tidal wetland Tribal lands Tribal rights Vegetated shallows Waterbody

Index of 2017 Nationwide Permits, Conditions, District Engineer’s Decision, Further Information, and Definitions That Remain in Effect Under the January 6, 2017, Final Rule (82 FR 1860) Nationwide Permits 1. Aids to Navigation 2. Structures in Artificial Canals 3. Maintenance 4. Fish and Wildlife Harvesting, Enhancement, and Attraction Devices and Activities 5. Scientific Measurement Devices 6. Survey Activities 7. Outfall Structures and Associated Intake Structures 8. Oil and Gas Structures on the Outer Continental Shelf 9. Structures in Fleeting and Anchorage Areas 10. Mooring Buoys 11. Temporary Recreational Structures 13. Bank Stabilization 14. Linear Transportation Projects 15. U.S. Coast Guard Approved Bridges 16. Return Water From Upland Contained Disposal Areas 17. Hydropower Projects 18. Minor Discharges 19. Minor Dredging 20.Response Operations for Oil or Hazardous Substances 22. Removal of Vessels 23. Approved Categorical Exclusions 24. Indian Tribe or State Administered Section 404 Programs 25. Structural Discharges 26. [Reserved] 27. Aquatic Habitat Restoration, Establishment, and Enhancement Activities 28. Modifications of Existing Marinas 30. Moist Soil Management for Wildlife 31. Maintenance of Existing Flood Control Facilities 32. Completed Enforcement Actions 33. Temporary Construction, Access, and Dewatering 34. Cranberry Production Activities 35. Maintenance Dredging of Existing Basins 36. Boat Ramps 37. Emergency Watershed Protection and Rehabilitation 38. Cleanup of Hazardous and Toxic Waste 41. Reshaping Existing Drainage Ditches 45. Repair of Uplands Damaged by Discrete Events 46. Discharges in Ditches 47. [Reserved] 49. Coal Remining Activities 53. Removal of Low-Head Dams 54. Living Shorelines

General Conditions 1. Navigation 2. Aquatic Life Movements 3. Spawning Areas 4. Migratory Bird Breeding Areas 5. Shellfish Beds 6. Suitable Material 7. Water Supply Intakes 8. Adverse Effects from Impoundments 9. Management of Water Flows 10. Fills Within 100-Year Floodplains 11. Equipment 12. Soil Erosion and Sediment Controls 13. Removal of Temporary Fills 14. Proper Maintenance 15. Single and Complete Project 16. Wild and Scenic Rivers 17. Tribal Rights 18. Endangered Species 19. Migratory Bird and Bald and Golden Eagle Permits 20. Historic Properties 21. Discovery of Previously Unknown Remains and Artifacts 22. Designated Critical Resource Waters 23. Mitigation 24. Safety of Impoundment Structures 25. Water Quality 26. Coastal Zone Management 27. Regional and Case-by-Case Conditions 28. Use of Multiple Nationwide Permits 29. Transfer of Nationwide Permit Verifications 30. Compliance Certification 31. Activities Affecting Structures or Works Built by the United States 32. Pre-Construction Notification

District Engineer’s Decision

Further Information

Definitions

Best management practices (BMPs) Compensatory mitigation Currently serviceable Direct effects Discharge Ecological reference Enhancement Ephemeral stream Establishment (creation) High Tide Line Historic property Independent utility Indirect effects Intermittent stream Loss of waters of the United States Navigable waters Non-tidal wetland Open water Ordinary high water mark Perennial stream Practicable Pre-construction notification Preservation Protected tribal resources Re-establishment Rehabilitation Restoration Riffle and pool complex Riparian areas Shellfish seeding Single and complete linear project Single and complete non-linear project Stormwater management Stormwater management facilities Stream bed Stream channelization Structure Tidal wetland Tribal lands Tribal rights Vegetated shallows Waterbody

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas