PROPOSED PERMIT MODIFICATION FOR THE CAMINADA HEADLANDS BACK BARRIER MARSH CREATION PROJECT BA-171 AND BA-193 IN LAFOURCHE PARISH

NAME OF APPLICANT: Louisiana Coastal Protection and Restoration Authority, P.O. Box 44027, Baton Rouge, Louisiana 70804.

LOCATION OF WORK: In back marsh along the Caminada headlands (Latitude: 29.127317, Longitude: -90.154439) near Port Fourchon in Lafourche Parish, within the East Central Louisiana Coastal basin in hydrological unit (HUC 08090301), as shown on the attached drawings.

CHARACTER OF WORK: The applicant has requested a Department of the Army permit modification for the previously issued Caminada Headlands Back Barrier Marsh Creation Project (BA-171) and Caminada Headland Back Barrier Marsh Creation Increment 1 Project (BA-193). Due to impacts from Hurricane Zeta, the proposed modification will require the construction of an exterior containment dike along the north side of the project area and partial restoration of dunes along the south side to facilitate the previously permitted marsh creation projects. The additional work will require 175 acres of impacts and the excavation of 367,239 cubic yards of material.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas