The application is for the discharge of fill material into Oologah Lake. The activity involves modification and repair (addition of new rip rap) to approximately 2,200 linear feet of shoreline and the disposal of weathered riprap on the south side of the existing bank stabilization.
The Corps proposes to add rip rap toe protection below the normal conservation pool elevation to the existing rip rap placed along the shoreline. Replacement of existing rip rap will occur as needed to replace the weathered stone. The weathered material will be removed and utilized as new bank stabilization along the southern edge of the existing rip rap for approximately 300 linear feet.