STATE - Indiana APPLICANT - Oakland Holdings, LLC PROJECT PURPOSE - To construct a residential development subdivision.

This notice announces an application submitted for a Department of the Army (DA) Permit, subject to Section 404 of the Clean Water Act (CWA).

APPLICANT: Oakland Holdings, LLC

944 N Baker Road

Boonville, IN 47601

LOCATION: Tributaries, wetlands and open waters in the Hines Ditch - Cypress Creek Watershed in Warrick County, Indiana. 12 Digit HUC 051402011102.

Latitude: 38.006215° North

Longitude: -87.331445° West

7.5 Minute Quad: Boonville Quadrangle

PURPOSE: To construct a residential development subdivision.

DESCRIPTION OF WORK: The applicant proposes to construct a residentialdevelopment that includes the installation of utilities, roadways, storm water ponds, and grading home lots for the final build out phase of the project.

To facilitate this new development, the applicant proposes to impact approximately 120 linear feet of perennial stream, 500 linear feet of intermittent stream, 2.51 acres of palustrine forested (PFO), 0.4 acres of palustrine scrub shrub (PSS), and 0.69 acres of palustrine emergent (PEM) wetlands. It is noted that a majority of these resources are in areas of pre-law (SMCRA 1977) mining where spoil material was simply side cast and no reclamation grading occurred.

It is important to note that this exact project was previously authorized under USACE ID. No LRL-2016-110-GJD; however, the project was never initiated under that authorization. There has now been a change in project proponents (Oakland Holdings), as well as a change in USACE jurisdictional authority; the project is now being reviewed again, under the most current regulations, pursuant to Section 404 of the Clean Water Act.

AVOIDANCE, MINIMIZATION, AND MITIGATION MEASURES: The applicant has considered impacts to jurisdictional waters of the U.S. in the development of this project and designed alternatives within the project area to reduce impacts. The applicant has identified 22.69 acres of jurisdictional wetlands and 7,458 linear feet of jurisdictional streams within the project area that will be avoided.

The applicant proposes to provide compensation for the unavoidable impacts associated with this project with permittee responsible onsite and offsite mitigation.

Off Site – The applicant is proposing to complete offsite mitigation on an approximately 13.5-acre tract located just west of Chandler, Warrick County, Indiana.

It is noted that this proposed mitigation plan is open to comment and subject to change. The Corps will make the determination of appropriate mitigation, upon review of all submitted information.

REVIEW PROCEDURES: A DA Permit cannot be issued if any legally required Federal, State, or local authorization or certification is denied. A DA permit, if otherwise warranted, will not be issued until a State of Indiana Section 401 Water Quality Certification (WQC) from the Indiana Department of Environmental Management (IDEM) is on file in this office or it is considered waived. In order to comply with Section 401 of the Clean Water Act, the applicant, by this notice, hereby applies for State certification from the Indiana Department of Environmental Management (IDEM).

Copies of this notice are sent to the appropriate Federal and State Fish and Wildlife Agencies. Their views and comments are solicited in accordance with the Fish and Wildlife Coordination Act of 1956. Based on available information, the proposed activity will not destroy or endanger any Federally-listed threatened or endangered species or their critical habitats, as identified under the Endangered Species Act, and therefore, initiation of formal consultation procedures with the U.S. Fish and Wildlife Service is not planned at this time.

Any person may request, in writing, within the comment period specified in this notice, that a public hearing be held to consider this application. A request for a public hearing must state the specific interest which might be damaged by issuance of the DA Permit.

The National Register of Historic Places (NHRP) has been examined, and it has been determined that there are likely no properties eligible for listing on the Register which would be directly affected by the proposed work. If we are made aware, as a result of comments received in response to this notice, or by other means, of specific archaeological, scientific, pre- historical, or historical sites or structures which might be affected by the proposed work, the District Engineer will immediately take the appropriate action necessary pursuant to the National Historic PreservationAct of 1966 - Public Law 89-665 as amended (including Public Law 96-515).

The decision whether to issue a permit will be based on an evaluation of the probable impact of the proposed activity on the public interest. That decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected to accrue from the proposal must be balanced against its reasonably foreseeable detriments. All factors which may be relevant to the proposal will be considered; among those are conservation, economics, aesthetic values, general environmental concerns, historic values, fish and wildlife values, flood damage prevention, land use, navigation, recreation, water supply, water quality, energy needs, safety, food production, and in general, the needs and welfare of the public. In addition, the evaluation of the impact of the activity on the public interest will include application of the guidelines (40 CFR Part 230) promulgated by the Administrator, United States Environmental Protection Agency (USEPA), under authority of Section 404(b) of the CWA.

The Corps of Engineers is soliciting comments from the public; Federal, State, and local agencies and officials; Indian tribes; and other interested parties in order to consider and evaluate the impacts of this proposed activity. It is presumed that all interested parties and agencies will wish to respond; therefore, a lack of response will be interpreted as meaning that there is no objection to the proposed project. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity.

Written statements received in this office on or before the closing date will become a part of the official record and will be considered in the determination on this permit request. Any objections which are received during this period will be forwarded to the applicant for possible resolution before the determination is made whether to issue or deny the requested DA Permit. A permit will be granted unless its issuance is found to be contrary to the public interest.

Information pertaining to this application is available for public examination during normal business hours upon prior request. Drawings are available on Louisville District's Internet site at http://www.lrl.usace.army.mil/Missions/Regulatory/Public-Notices/ All comments regarding this proposal should be addressed to Mr. Justin Garrett, CELRL-RDS at the address noted above and should refer to the Public Notice Number LRL-2020-1037-JMG.

If you desire to submit your comments by email, you must comply with the following:

In the subject line of your email, type in ONLY the Public Notice ID No. LRL-2020-1037-JMG.

Example:

Subject: LRL-2020-1037-JMG

b) Provide your physical mailing address and telephone number.

c) Send your email to: lrl.regulatorypubliccomment@usace.army.mil.

d) If you are sending attachments greater than 1 Mb in size with your email, you must send a

hard copy (CD or paper) to the Corps’ physical address as well.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas