Home

Los Angeles District

Run scraper

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

Application for Permit BAE Systems Pride of San Diego Dry Dock Dredging Project

The proposed project would include dredging of approximately 35,100 cubic yards of sediment material to extend the Pride of San Diego Dry Dock sump to the north with ocean and upland disposal.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas