Home

Philadelphia District

Run scraper

The applicant

Basic information

Fill out these two fields at minimum.

— or —

How Big?

Where?

Links to source documents

Raw text

You can copy from here when filling out the rest of the page.

The applicant, Public Service Electric and Gas Nuclear LLC (PSE&G), proposes to continue hydraulic maintenance dredging and desilting activities (intake bays only) at the Salem and Hope Creek Generating Station's circulating and service water intake structures, the Salem discharge pipes, the Hope Creek barge slip, and at the Hope Creek barge unloading dock area. The project is located at the Salem and Hope Creek Nuclear Generating Stations, on Artificial Island, in Lower Alloways Creek Township, Salem County, New Jersey. The purpose of the project is to continue the dredging and desilting activities to maintain unobstructed/unrestricted water flow for the safe operation of the Salem and Hope Creek Generating Stations; and to provide adequate water depths for safe navigation for the loading and unloading of barges and/or vessels at the facility. Public comments are due by March 26, 2021. More details are available in the "Public Notice & Plan Details" attachment.

The applicant, Public Service Electric and Gas Nuclear LLC (PSE&G),proposes to continue hydraulic maintenance dredging and desilting activities (intake bays only) at the Salem and Hope Creek Generating Station's circulating and service water intake structures, the Salem discharge pipes, the Hope Creek barge slip, and at the Hope Creek barge unloading dock area. The project is located at the Salem and Hope Creek Nuclear Generating Stations, on Artificial Island, in Lower Alloways Creek Township, Salem County, New Jersey.The purpose of the project is to continue the dredging and desilting activities to maintain unobstructed/unrestricted water flow for the safe operation of the Salem and Hope Creek Generating Stations; and to provide adequate water depths for safe navigation for the loading and unloading of barges and/or vessels at the facility. Public comments are due by March 26, 2021. More details are available in the "Public Notice & Plan Details" attachment.

Rough impact

We use the fields in this section to decide whether to conduct an in-depth review.

Permit Manager

Dates

Identity numbers

Permits, certifications, and locations related to this particular notice

History of edits

Data are available as CSV download in the following schemas