You can copy from here when filling out the rest of the page.
Section 408 permit application from Los Angeles County Metropolitan Transportation Agency, through the Los Angeles County Flood Control District, to the U.S. Army Corps of Engineers to bore twin tunnels for the construction of a heavy rail transit subway line under the Sepulveda box culvert at the southeast intersection of Wilshire Boulevard and South Sepulveda Boulevard (near 1200 South Sepulveda Boulevard) in the city of Los Angeles, Los Angeles County, California.
Bore twin tunnels using Earth Pressure Balance Tunnel Boring Machines. The tunneling will be approximately 27 feet below the Sepulveda Channel concrete box culvert. The purpose of the project is to improve transit travel time in order to provide more reliable transit service via future subway.